Germany – Drilling-mud engineering services – AP04_0006b_Mud Services
Opportunity Score
Confidence: 40%
Complexity: medium
—
Deadline
services
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This tender, published by EnBW Energie Baden-Württemberg AG on behalf of WärmeWerk Wörth GmbH, seeks mud services (drilling fluids) for two deep geothermal wells (B-GT1 and B-GT2) in Wörth, Germany, with options for extensions and sidetracks. The procedure is a negotiated procedure with call for competition under the Utilities Directive (2014/25/EU). The contract is expected to run from Q2 2027 to Q3/Q4 2027. Only one lot (LOT-0000) is fully described; four other lots appear in structured data but lack details. The award is based on quality (60%) and price (40%). The deadline for submission is 2 July 2026 at 15:00 (CET).
Strengths
Documents available
Medium complexity
Electronic submission
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Tenders must be submitted electronically via Open portal
- Language: German (DEU) for submission; English (ENG) also accepted
- Variant offers are not allowed
Award Criteria
Akzeptanz des Vertrags
Akzeptanz des Vertrags
| Criterion | Type |
|---|---|
Akzeptanz des Vertrags Akzeptanz des Vertrags | Quality |
Buyer
Name
EnBW Energie Baden-Württemberg AG
Location
Karlsruhe, DEU
Website
Identifier
DE812334050
Lots (1)
Provision of mud services / drilling fluids services for geothermal wells B-GT1 and B-GT2, including optional sidetracks and extensions. Performance is dependent on actual drilling progress, expected from Q2 2027 to Q3/Q4 2027.
Procurement Details
Publication
02 Jun 2026
Deadline
—
Procedure
open
Contract
services
Language
DEU, ENG
Publication #
381089-2026
Classification
Performance: Germany
Documents (2)
Opportunity Score
Confidence: 40%
Complexity: medium
—
Deadline
services
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation