Poland – Construction work for electricity power lines – Budowa sieci elektroenergetycznej – 2 zadania (części): Część 1. Stąporków-Serbinów et_1; Część 2. Stąporków-Furmanów-Skarżysko; – RE Skarżysko
Opportunity Score
Confidence: 30%
Complexity: medium
21 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This tender from PGE Dystrybucja S.A. is an open procurement for construction of medium voltage power lines in the Skarżysko area, Poland. It is divided into two lots: Lot 1 (Stąporków-Serbinów) and Lot 2 (Stąporków-Furmanów and Stąporków-Skarżysko). The tender is conducted under Polish law (non-public procurement) with electronic submission required. Key information such as estimated value, award criteria, and selection criteria are missing from the available data. The buyer reserves the right to cancel the procedure without cause. The deadline for submission is 6 July 2026.
Strengths
Documents available
Open procedure
Medium complexity
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Electronic submission via Open portal is required.
- Tender must be submitted in Polish language.
- A tender guarantee (wadium) is required as per the terms of the tender documents (SWZ).
Buyer
Name
PGE DYSTRYBUCJA S.A.
Location
LUBLIN, POL
Website
Buyer profile
Identifier
9462593855
Lots (2)
Construction of a medium voltage cable line from GPZ Stąporków to Serbinów, stage 1, in the Skarżysko region.
Construction of medium voltage cable lines from GPZ Stąporków to Furmanów and from GPZ Stąporków to Skarżysko, in the Skarżysko region.
Procurement Details
Publication
02 Jun 2026
Deadline
06 Jul 2026, 07:00
Procedure
open
Contract
works
Language
POL
Publication #
380420-2026
Classification
Performance: Poland
Documents (2)
Opportunity Score
Confidence: 30%
Complexity: medium
21 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation