Design documentation and construction of water intake point

Skarb Państwa Państwowe Gospodarstwo Leśne Lasy Państwowe Nadleśnictwo Opole·Opole, Poland·PLN 242k | EUR 57.1k·Expired · Jul 06, 2026·Open·Works
Original notice title

Poland – Construction work – Wykonanie kompletnej dokumentacji projektowej wraz z uzyskaniem wszystkich decyzji administracyjnych niezbędnych do przeprowadzania robót budowlanych oraz wykonanie robót polegających na budowie punktu czerpania wody, zbiornika podziemnego wraz z utwardzonym placem manewrowym realizowanych na terenie Nadleśnictwa Opole - Leśnictwo Krasiejów

70/100

Opportunity Score

Needs reviewMedium complexity
WorksExpired
Why this score?

Opportunity

70 / 100

Complexity

65 / 100

Risk factors

Experience requirement of at least one underground tank contract ≥100,000 PLN may be difficult for some bidders to prov...

Design-build within 6 months may be tight given permitting and construction.

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Tender facts

Contracting authority
Skarb Państwa Państwowe Gospodarstwo Leśne Lasy Państwowe Nadleśnictwo Opole
Country
Poland
CPV
45000000 - Construction work +13 more
Deadline
Jul 06, 2026
Estimated value
PLN 242k (approx. EUR 57.1k)

Overview

Moderate opportunity

Key Facts

  • PLN 242k estimated value
  • Works contract
  • 1 lot
  • Duration 6 MONTH
  • Design and obtain all necessary permits for construction of water intake point
  • Construction of underground steel tank (min. 50 m³) with corrosion protection and frost protection
Show full summary

This tender by the Polish State Forests (Nadleśnictwo Opole) is for the design and construction of a water intake point with an underground tank (minimum 50 m³) and a hardened maneuvering area in Krasiejów Forest District. The project is EU-funded under the FEnIKS 2021-2027 program and aims to improve forest fire protection. The contract follows a 'design and build' formula with a duration of 6 months. The estimated value is 242,000 PLN. Award is based on price (60%) and warranty period (40%). Key eligibility criteria include financial capacity (≥100,000 PLN credit or funds), liability insurance (≥200,000 PLN), and experience in underground tank construction (≥100,000 PLN). Submission is via the Josephine platform by 2026-07-06.

Risks

Experience requirement of at least one underground tank contract ≥100,000 PLN may be difficult for some bidders to prov...

Design-build within 6 months may be tight given permitting and construction.

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Technical

  • Design-build contract with 6-month execution period
  • Minimum 36-month warranty on construction works
  • Experience in similar underground tank construction worth at least 100,000 PLN

Award Criteria

Lot 1

Price: 60% weight - formula based on lowest price. — 60%Warranty period: 40% weight - points increase with longer warranty, minimum 36 months. — 40%

Buyer

Lots (1)

LOT-0001

Design documentation and construction of water intake point

Complete design documentation including obtaining building permits, and construction of an underground water tank (≥50 m³), hardened maneuvering area (≥20x20 m), and access road. Includes author's supervision during construction.

WorksEU fundedElectronic submission

EUR 57.1k

Estimated value

Location

PL524, Poland

Duration

6 MONTH

Category

Construction work

Award Criteria

Price

Deadline

Expired Jul 06, 2026

Procurement Details

Publication date
02 Jun 2026
Languages
Polish

Reference metadata

Legal basis
32014L0024

Reference IDs

Tender ID
379883-2026

Documents (1)

Similar tenders