Ireland – Engineering works and construction works – MetroLink, Dublin – M120 Heavy Civils Enabling Works Framework Agreement
Opportunity Score
Confidence: 55%
Complexity: high
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
MetroLink Dublin M120 Heavy Civils Enabling Works Framework Agreement – a multi-party framework with two value-based lots for large and smaller civil engineering works. TII is the contracting authority. Framework duration 8 years (5+3). Estimated total framework value €1.2B. Applicants can apply for one lot only. Three tenderers per lot will be appointed. First call-off contracts are pre-defined: Lot 1: Dublin Airport station box; Lot 2: Glasnevin station retaining wall. Procurement is two-stage: PQQ (selection) then ITN/negotiation/BAFO. The framework can also be used by Irish Rail.
Strengths
Documents available
Electronic submission
High budget
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Applicants can apply for only one lot.
- Must register on Metrolink e-Sourcing portal (Open portal) and submit PQQ by deadline.
- Two-stage process: PQQ (selection) then ITN/negotiation/BAFO.
Buyer
Name
Transport Infrastructure Ireland (TII)
Location
Dublin, IRL
Website
Buyer profile
Identifier
9510201H
Lots (2)
Lot 1 covers large civils works (e.g., station boxes, tunnel portals, viaducts). First call-off: Dublin Airport station box. Estimated maximum framework value €1B.
Lot 2 covers smaller civils works (e.g., retaining walls, foundation/support). First call-off: Glasnevin station retaining wall. Estimated maximum framework value €200M.
Procurement Details
Publication
28 May 2026
Deadline
—
Procedure
open
Contract
works
Duration
8 YEAR
Language
ENG
Publication #
370633-2026
Classification
Performance: Ireland
Documents (2)
Opportunity Score
Confidence: 55%
Complexity: high
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation