Tenderwize
Back to tender search

France – Water-well drilling – Accord cadre - Mission de Géothermie et Forage pour la construction d’une centrale d’énergie sur la Technopole Futuroscope – Création des forages de production et d’injection

DALKIA (31)Toulouse, FranceNot disclosedopen
45

Opportunity Score

Confidence: 55%

Complexity: high

Deadline

works

Contract

Framework

Deep Portfolio Analysis

  • Company fit score
  • Missing certificates
  • Eligibility blockers
  • Bid / No-Bid recommendation
Create account for AI analysis

AI Analysis Summary

Moderate opportunity

This tender, issued by Dalkia for geothermal drilling works at the Futuroscope technology park in Chasseneuil-du-Poitou, France, is a framework agreement consisting of up to 8 production and injection wells. It involves two phases: exploration drilling (with 2 firm and up to 3 optional doublets) and subsequent reaming/equipping for exploitation. The procedure is a restricted negotiation procedure under Directive 2014/25/EU (utilities). Only the contract notice (TED) has been analyzed; procurement documents are not included.

Strengths

Documents available

Electronic submission

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

  • Restricted procedure with negotiation: only candidates meeting eligibility criteria receive the DCE
  • Submission language: French only
  • Electronic submission via Open portal is required

Buyer

Name

DALKIA (31)

Location

Toulouse, FRA

Buyer profile

Open profile

Identifier

45650053704622

Lots (1)

#LOT-0001Accord cadre à bon de commande - Mission de Géothermie et Forage pour la construction d’une centrale d’énergie sur la Technopole Futuroscope – Création des forages de production et d’injection

Framework agreement for geothermal drilling: up to 8 wells (production and injection) including exploration drilling, reaming, and equipping. The works are divided into two phases: Phase 1 (exploration) and Phase 2 (transformation into exploitation wells). The scope includes multiple drilling sites with specified diameters and depths up to 180m.

EUR 1,085,00045262220FRA

Procurement Details

Publication

28 May 2026

Deadline

Procedure

open

Contract

works

Language

FRA

Publication #

370502-2026

Classification

Performance: France

Documents (2)