France – Water-well drilling – Accord cadre - Mission de Géothermie et Forage pour la construction d’une centrale d’énergie sur la Technopole Futuroscope – Création des forages de production et d’injection
Opportunity Score
Confidence: 55%
Complexity: high
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This tender, issued by Dalkia for geothermal drilling works at the Futuroscope technology park in Chasseneuil-du-Poitou, France, is a framework agreement consisting of up to 8 production and injection wells. It involves two phases: exploration drilling (with 2 firm and up to 3 optional doublets) and subsequent reaming/equipping for exploitation. The procedure is a restricted negotiation procedure under Directive 2014/25/EU (utilities). Only the contract notice (TED) has been analyzed; procurement documents are not included.
Strengths
Documents available
Electronic submission
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Restricted procedure with negotiation: only candidates meeting eligibility criteria receive the DCE
- Submission language: French only
- Electronic submission via Open portal is required
Buyer
Name
DALKIA (31)
Location
Toulouse, FRA
Website
Buyer profile
Identifier
45650053704622
Lots (1)
Framework agreement for geothermal drilling: up to 8 wells (production and injection) including exploration drilling, reaming, and equipping. The works are divided into two phases: Phase 1 (exploration) and Phase 2 (transformation into exploitation wells). The scope includes multiple drilling sites with specified diameters and depths up to 180m.
Procurement Details
Publication
28 May 2026
Deadline
—
Procedure
open
Contract
works
Language
FRA
Publication #
370502-2026
Classification
Performance: France
Documents (2)
Opportunity Score
Confidence: 55%
Complexity: high
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation