Poland – Construction work for gas pipelines – Budowa gazociągu DN400 MOP 8,4 MPa relacji Mory-Reguły i przystosowanie do tłokowania gazociągu DN300/DN400 SG Mory-Gassy
Opportunity Score
Confidence: 65%
Complexity: high
15 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Open tender by GAZ-SYSTEM S.A. (Poland) for construction of a DN400 MOP 8.4 MPa gas pipeline between Mory and Reguły, and adaptation of the DN300/DN400 SG Mory-Gassy pipeline for pigging. Single lot, works contract, not a framework agreement. Award criteria: lowest price (100% weight). Strict eligibility criteria including financial standing (minimum credit/debt capacity 4M PLN; minimum average annual revenue 12.5M PLN; minimum liquidity ratio 1.10 or alternative EBITDA/debt conditions), experience (at least one pipeline project of min. 4 km, MOP ≥6.3 MPa, DN ≥400, steel grade L415 or equivalent), welding technology approval, qualified key personnel (Project Manager, Construction Manager, Welding Supervisor, etc.), and equipment requirements. Bid bond 250,000 PLN. Submission via electronic platform by 2026-06-30 08:00 (UTC). No estimated contract value provided. Procurement documents include restricted information accessible only via buyer's portal.
Strengths
Open procedure
15 days left
Electronic submission
Risks
No procurement documents available
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Bid security (wadium) of 250,000 PLN must be provided.
- Submission in Polish language only, via electronic platform Open portal
- Offer must be signed with qualified electronic signature.
Buyer
Name
Operator Gazociągów Przesyłowych GAZ-SYSTEM S.A.
Location
Warszawa, POL
Website
Identifier
527-243-20-41
Lots (1)
Construction of DN400 gas pipeline with MOP 8.4 MPa between Mory and Reguły, and adaptation of the DN300/DN400 pipeline for pigging. Place of performance: PL911 (Warszawski stołeczny region).
Procurement Details
Publication
28 May 2026
Deadline
30 Jun 2026, 08:00
Procedure
open
Contract
works
Language
POL
Publication #
369943-2026
Classification
Performance: Poland
Documents (1)
Opportunity Score
Confidence: 65%
Complexity: high
15 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation