This tender, issued by DALKIA, concerns works for the hydraulic connection of a 300 kW miscanthus boiler in the district heating plant of Poitiers Biard. The procedure is a restricted negotiated procedure. Only one lot has been identified (LOT-0001), with an estimated duration of 3 months and a tender deadline of 2026-06-12. No estimated value is provided. The selection criteria focus on professional and financial capacity, with references required. The award criteria are not disclosed in this notice.
Strengths
Documents available
Medium complexity
Electronic submission
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Submission via the secure platform (Open portal)
- Tender must be submitted by 12 June 2026 at 12:00 (CEST)
- All documents must be in French
Buyer
Lots (1)
This lot includes supply and installation of hot water piping, valves, and equipment for connecting the new miscanthus boiler to the district heating network, including a pressure decoupler, primary/secondary pumps (provided by Dalkia), and supply of air and water for the boiler. The works are expected to start with studies from 29/06/2026 to 10/07/2026, followed by works from 13/07/2026 to 28/08/2026. The contract duration is 3 months. Optional tranches and additional works may be defined later.
Procurement Details
Publication
28 May 2026
Deadline
—
Procedure
open
Contract
works
Duration
3 MONTH
Language
FRA
Publication #
369201-2026
Classification
Performance: France
Documents (2)
Opportunity Score
Confidence: 35%
Complexity: medium
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation