Poland – Engineering works and construction works – Rozbudowa układu drogowego wraz z budową linii tramwajowej od Pętli Brynów do planowanej Pętli Kostuchna oraz budową węzła przesiadkowego "Kostuchna"
Opportunity Score
Confidence: 65%
Complexity: high
7 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Large-scale infrastructure project in Katowice, Poland for road expansion and construction of a tram line from Brynów loop to Kostuchna loop, including an interchange hub. Single lot works contract with 30-month duration, EU co-financed. Open procedure, submission deadline 2026-06-22. The estimated value is not disclosed. Award criteria: price 60%, quality (key personnel experience) 40%. Strict eligibility criteria include specific construction experience in tram/rail tracks, traction network, bridge over active railway, traction substation, and road works, plus financial capacity min. 25 million PLN. High wadium (10 million PLN).
Strengths
Documents available
Open procedure
7 days left
Risks
Submission deadline in 7 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Experience: at least 1 reference each for: a) construction/reconstruction of tram/rail track ≥1000 m (tech. ballast/slab), b) traction network ≥500 m, c) bridge/object over active railway for road/rail traffic, d) comprehensive construction/reconstruction of traction substation building with equipment, e) road with bituminous pavement ≥15,000 m2 including street lighting and storm drainage
- Each of the above references must be performed under one contract/investment and for consortia satisfied in full by at least one member
- Financial capacity: credit line or own funds ≥25,000,000 PLN
Award Criteria
Cena
"Cena" - znaczenie 60%
| Criterion | Type |
|---|---|
Cena "Cena" - znaczenie 60% | Price |
Buyer
Name
Miasto Katowice
Location
Katowice, POL
Website
Identifier
6340010147
Lots (1)
Construction of a two-track tram line, tram loop, road expansions, a transfer hub, traction substations, bicycle paths, lighting, drainage, utilities relocation, and environmental works. Excludes a separate road section. Social aspects: improved connectivity with city center.
Procurement Details
Publication
27 May 2026
Deadline
22 Jun 2026, 06:00
Procedure
open
Contract
works
Duration
30 MONTH
Language
POL
Publication #
365292-2026
Classification
Performance: Poland
Documents (2)
Opportunity Score
Confidence: 65%
Complexity: high
7 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation