Portugal – Substation construction work – Empreitada de Conceção-Construção de uma Subestação Elétrica AT GIS 60/30 KV - 60/15 KV - 65MVA no Porto de Leixões
Opportunity Score
Confidence: 50%
Complexity: medium
7 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Design-build contract for a 65MVA GIS electrical substation (60/30 kV, 60/15 kV) at Porto de Leixões, Portugal. Open procedure, estimated value €15M, duration 900 days. Award criteria: price 60%, quality 40%. Submission deadline 22 June 2026. Only one lot fully detailed; a second lot is indicated but incomplete.
Strengths
Documents available
Open procedure
Medium complexity
Risks
Submission deadline in 7 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Design-build contract for a GIS substation
- Duration: 900 days from contract award
- Must comply with EU procurement directives (2014/25/EU)
Award Criteria
Preço
Preço
| Criterion | Type |
|---|---|
Preço Preço | Price |
Buyer
Name
APDL - Administração dos Portos do Douro, Leixões e Viana do Castelo, SA
Location
Matosinhos, PRT
Website
Identifier
501449752
Lots (2)
Design-build of a 65MVA GIS electrical substation with 60/30 kV and 60/15 kV systems at Porto de Leixões. Includes all works, supplies, and services necessary for completion.
A second lot is referenced in structured data but lacks identifier, title, description, CPV, value, and deadline. Only award criteria with quality type and no weight are present. Lot data is incomplete.
Procurement Details
Publication
26 May 2026
Deadline
22 Jun 2026, 18:00
Procedure
open
Contract
works
Duration
900 DAY
Language
POR
Publication #
363076-2026
Classification
Performance: Portugal
Documents (2)
Opportunity Score
Confidence: 50%
Complexity: medium
7 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation