Germany – Bridge construction work – B 169 Ortsumgehung Göltzschtal BA 1-7 - BW 9 Neubau Geh- und Radwegbrücke
Opportunity Score
Confidence: 40%
Complexity: medium
22 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This tender by Landesamt für Straßenbau und Verkehr, Niederlassung Plauen (Germany) is for the construction of a pedestrian and cycle bridge (BW 9) as part of the B 169 Ortsumgehung Göltzschtal project. It is a single-lot, open procedure under EU Directive 2014/24. The award is based solely on the lowest price (100% weight). The deadline for receipt of tenders is 2026-07-07 09:30 (CEST). No estimated value is provided in the notice.
Strengths
Documents available
Open procedure
Medium complexity
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Tenders must be submitted electronically via www.evergabe.de.
- All documents in German.
- Variants are allowed.
Award Criteria
Preis
Der Preis (in EUR, netto) wird ermittelt aus der Wertungssumme des Angebots. Die Wertungssumme (in EUR, netto) wird aus der nachgerechneten Angebotssumme ermittelt. Der Zuschlag erfolgt auf das Angebot, welches unter Berücksichtigung vorstehender Regelungen die niedrigste Wertungssumme aufweist.
| Criterion | Type |
|---|---|
Preis Der Preis (in EUR, netto) wird ermittelt aus der Wertungssumme des Angebots. Die Wertungssumme (in EUR, netto) wird aus der nachgerechneten Angebotssumme ermittelt. Der Zuschlag erfolgt auf das Angebot, welches unter Berücksichtigung vorstehender Regelungen die niedrigste Wertungssumme aufweist. | Price |
Buyer
Name
Landesamt für Straßenbau und Verkehr, Niederlassung Plauen
Location
Plauen, DEU
Website
Identifier
14-0706069LASUV05-71
Lots (1)
Construction of a pedestrian and cycle bridge including excavation (820 m³), soil supply (590 m³), concrete (518 m³), reinforcing steel (80 t), elastomeric bearings (7), mastic asphalt (400 m²), asphalt surface (350 m²), steel railings (345 m), and railing lighting (164 m). Also includes planning services such as traffic orders, utility permits, and as-built documentation. A safety and health coordinator is required. Completion of the bridge without electrical connection by 30.11.2027.
Procurement Details
Publication
26 May 2026
Deadline
07 Jul 2026, 07:30
Procedure
open
Contract
works
Language
DEU
Publication #
362074-2026
Classification
Performance: Germany
Documents (2)
Opportunity Score
Confidence: 40%
Complexity: medium
22 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation