Tenderwize
Back to tender search

Germany – Rechargers – Lieferung, Aufbau und Inbetriebnahme einer Ladeinfrastruktur für Elektrobusse (LIS) inkl. Zubehör für die Hausemann und Mager GmbH & Co. KG

Hausemann und Mager GmbH & Co. KGHagen, GermanyNot disclosed7 days leftopen
55

Opportunity Score

Confidence: 60%

Complexity: medium

7 days

Deadline

supplies

Contract

Deep Portfolio Analysis

  • Company fit score
  • Missing certificates
  • Eligibility blockers
  • Bid / No-Bid recommendation
Create account for AI analysis

AI Analysis Summary

Moderate opportunity

Open tender for delivery, setup, and commissioning of electric bus charging infrastructure for Hausemann und Mager GmbH & Co. KG in Hagen, Germany. Single lot with initial 3 charging points (expandable to 6), including earthworks and load management. Award criteria: 50% price, 50% quality. Strict eligibility: commercial register, liability insurance (min €3M), annual turnover min €5M, ISO 9001, and two comparable references. No estimated value disclosed. Submission deadline: 2026-06-22 10:00 UTC. Language: German only.

Strengths

Documents available

Open procedure

Medium complexity

Risks

Submission deadline in 7 days

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

  • Supply and installation of at least 3 charging points with 200 kW each for simultaneous charging
  • Expandable to at least 6 charging points with minimum 80 kW per point
  • Total system capacity of 600 kW

Award Criteria

Preis

Preis

Type: Price

Buyer

Name

Hausemann und Mager GmbH & Co. KG

Location

Hagen, DEU

Identifier

HRB 646

Lots (1)

#LOT-0000Lieferung, Aufbau und Inbetriebnahme einer Ladeinfrastruktur für Elektrobusse (LIS) inkl. Zubehör für die Hausemann und Mager GmbH & Co. KG

Supply, installation, and commissioning of charging infrastructure for 12-meter low-floor electric buses including load management system, earthworks, and optional expansion. Initial 3 charging points (200 kW each simultaneous) expandable to 6 (80 kW each). Existing 1000 kVA transformer available.

31681500, 31158100DEU

Procurement Details

Publication

26 May 2026

Deadline

22 Jun 2026, 10:00

Procedure

open

Contract

supplies

Language

DEU

Publication #

361719-2026

Classification

Performance: Germany

Documents (2)