Denmark – Pipeline relaying works – Rammeaftale om levering af fjernvarmerør og muffemontage DN400-DN600
Opportunity Score
Confidence: 50%
Complexity: low
8 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
I/S Vestforbrænding issues a framework agreement for district heating pipe laying and muff mounting (DN400-DN600) in the Glostrup-Ballerup area, Denmark. The contract covers approximately 5 km of new low-temperature transmission line (LTL S1.0). The framework is for 6 years (though description mentions 8-year period) with an estimated value of 100,000,000 DKK and a maximum value of 150,000,000 DKK. Award is based solely on lowest price. Submission is electronic in Danish by 23 June 2026.
Strengths
Documents available
Open procedure
Low complexity
Risks
Submission deadline in 8 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Framework agreement for 6 years (duration period value = 6 years, but description mentions 8-year period – inconsistency).
- Electronic submission is required.
- Danish language for submissions.
Buyer
Name
I/S Vestforbrænding og datterselskaber
Location
Glostrup, DNK
Buyer profile
Identifier
10866111
Lots (2)
Main lot covering the entire scope: supply and installation of district heating pipes (DN600-DN400) and muff mounting for a 5 km trace from Ejby Mosevej 219, Glostrup to Borupvang, Ballerup, including branch structures. Framework agreement with no guaranteed minimum volume.
Incomplete lot data. Only additional CPV code 44163240 provided; no other details available.
Procurement Details
Publication
26 May 2026
Deadline
23 Jun 2026, 10:00
Procedure
open
Contract
works
Duration
6 YEAR
Language
DAN
Publication #
358720-2026
Classification
Performance: Denmark
Documents (2)
Opportunity Score
Confidence: 50%
Complexity: low
8 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation