Montenegro – Railway construction works – Rehabilitation of 9 Tunnels on the Vrbnica–Bar Railway Line, Montenegro
Opportunity Score
Confidence: 70%
Complexity: high
70 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Rehabilitation of nine railway tunnels (total length ~2,922m) on the Vrbnica–Bar line in Montenegro. EIB co-financed, FIDIC Red Book 2017. Single lot, 24-month duration, works under operational railway traffic.
Strengths
Documents available
Open procedure
70 days left
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Minimum average annual turnover for construction works (last 3 years): EUR 14 million.
- Access to credit/lines of credit: at least EUR 1.9 million.
- At least 2 completed contracts in last 10 years each worth ≥ EUR 14 million (net of VAT) for similar tunnel works (including road/transport tunnels), or 1 contract ≥ EUR 28 million.
Buyer
Name
Railway Infrastructure of Montenegro JSC – Podgorica (RIoM) / Željeznička Infrastruktura Crne Gore AD – Podgorica (ŽICG)
Location
Podgorica, MNE
Website
Identifier
000000
Lots (1)
Civil and structural rehabilitation of nine tunnels including lining reinforcement, drainage, waterproofing, track-side works, and portal repairs, executed during daily free-traffic intervals.
Procurement Details
Publication
25 May 2026
Deadline
24 Aug 2026, 09:00
Procedure
open
Contract
works
Duration
24 MONTH
Language
ENG
Publication #
355305-2026
Classification
Performance: MNE
Documents (1)
Opportunity Score
Confidence: 70%
Complexity: high
70 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation