Czechia – Substation equipment – MSK – dodavka a instalace NN a SLP
Opportunity Score
Confidence: 30%
Complexity: medium
1 days
Deadline
supplies
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Tender by Město Kuřim for supply and installation of low-current (SLP) and low-voltage (NN) electrical systems, divided into two lots. Open procedure, award based on lowest price. No estimated value provided. Submission deadline: 2026-06-16 08:00 UTC. Only structured notice and XML available; no procurement documents analyzed.
Strengths
Documents available
Open procedure
Medium complexity
Risks
Submission deadline in 1 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Electronic submission required
- Language: Czech (CES)
- Bid must be submitted via Open portal
Award Criteria
Nejnižší nabídková cena celkem bez DPH
Nejnižší nabídková cena celkem bez DPH. Bližší specifikace v rámci ZD.
| Criterion | Type |
|---|---|
Nejnižší nabídková cena celkem bez DPH Nejnižší nabídková cena celkem bez DPH. Bližší specifikace v rámci ZD. | Price |
Buyer
Lots (2)
Supply and installation of low-current systems including structured cabling (SKS), alarm system (PZTS), access control (ACS), CCTV, and audio system. Includes cabling, configuration, and commissioning.
Supply and installation of low-voltage electrical installations including outdoor LV distribution, switchboards, cable routes, and related electrical work, including testing and documentation.
Procurement Details
Publication
25 May 2026
Deadline
16 Jun 2026, 08:00
Procedure
open
Contract
supplies
Duration
2 MONTH
Language
CES
Publication #
355079-2026
Classification
Performance: Czech Republic
Documents (2)
Opportunity Score
Confidence: 30%
Complexity: medium
1 days
Deadline
supplies
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation