Tenderwize
Back to tender search

Luxembourg – Medium-voltage installation work – Nouveau Centre Logistique de l’Infrastructure Ferroviaire à Bettembourg/Dudelange / Travaux d’installations de courant fort. Phase candidatures

Société Nationale des Chemins de Fer LuxembourgeoisLuxembourg, LuxembourgNot disclosedrestricted
50

Opportunity Score

Confidence: 40%

Complexity: medium

Deadline

works

Contract

SME suitable

Deep Portfolio Analysis

  • Company fit score
  • Missing certificates
  • Eligibility blockers
  • Bid / No-Bid recommendation
Create account for AI analysis

AI Analysis Summary

Moderate opportunity

This is a restricted procedure for medium-voltage installation works at the new railway infrastructure logistics center in Bettembourg/Dudelange, Luxembourg. The buyer is the Société Nationale des Chemins de Fer Luxembourgeois (CFL). The tender includes a 1,600 kVA transformer, medium-voltage cells, LV switchboards, LED lighting, a 458 kVA generator, EV charging stations, and emergency lighting. Only one lot is identified. The estimated value is not provided. The deadline for receipt of tenders is 2026-06-26 at 10:00 (from XML notice). The procedure is restricted, and electronic submission is required. No selection or award criteria are specified in the available data.

Strengths

Documents available

Medium complexity

SME suitable

Risks

Restricted procedure — pre-qualification required

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

  • Restricted procedure: candidates must first submit a qualification application (phase candidatures).
  • Electronic submission is required via the platform: Open portal
  • Submission languages: French and German.

Buyer

Name

Société Nationale des Chemins de Fer Luxembourgeois

Location

Luxembourg, LUX

Identifier

LU10061242

Lots (1)

#LOT-0001Nouveau Centre Logistique de l’Infrastructure Ferroviaire à Bettembourg/Dudelange / Travaux d’installations de courant fort. Phase candidatures

Works for the new railway logistics center including medium-voltage transformer (1,600 kVA), medium-voltage cells, power rail distribution, LV switchboards, LED lighting, a 458 kVA generator, 20 AC charging stations (22 kW), one 400 kW supercharger, and centralized emergency lighting with two batteries.

45315500, 45315600LUX

Procurement Details

Publication

25 May 2026

Deadline

Procedure

restricted

Contract

works

Language

FRA, DEU

Publication #

353843-2026

Classification

Performance: Luxembourg

Documents (2)