Italy – Wastewater-plant repair and maintenance work – Fornitura, posa in opera ed avviamento di nuove membrane di ultrafiltrazione a servizio della linea mbr del depuratore di Rozzano (MI)
Opportunity Score
Confidence: 30%
Complexity: medium
4 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This notice by Cap Evolution Srl (Italy) concerns the supply, installation, and commissioning of new ultrafiltration membranes for the MBR line at the Rozzano (MI) wastewater treatment plant. It is divided into two lots with a total estimated value of €6,852,000. The procedure is open, electronic submission is allowed, and the award is based on the economically most advantageous tender (quality only). Only the TED XML notice and a link to procurement documents were provided; no extracted document text was analyzed.
Strengths
Documents available
Open procedure
Medium complexity
Risks
Submission deadline in 4 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Open procedure.
- Electronic submission via Open portal
- Language: Italian only.
Buyer
Lots (2)
Supply, installation, and commissioning of ultrafiltration membranes for the MBR line at Rozzano plant - lot 1. Duration 8 months.
Supply, installation, and commissioning of ultrafiltration membranes for the MBR line at Rozzano plant - lot 2. Duration 8 months.
Procurement Details
Publication
21 May 2026
Deadline
19 Jun 2026, 10:00
Procedure
open
Contract
works
Duration
8 MONTH
Language
ITA
Publication #
353560-2026
Classification
Documents (2)
Opportunity Score
Confidence: 30%
Complexity: medium
4 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation