Romania – Construction work for highways, roads – PROIECTARE (corelarea cu obiectivele de investitie ale AIHC si CFR) SI EXECUTIE „Legatura rutiera intre Autostrada de Centura Bucuresti Nord si viitorul Terminal 2 al Aeroportului International Henri Coanda (AIHC)”
Opportunity Score
Confidence: 50%
Complexity: high
0 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This is an open tender by Compania Nationala de Investitii Rutiere S.A. (CNIR) for the design and execution of a road link connecting the North Bucharest Beltway to the future Terminal 2 of Henri Coanda International Airport in Romania. The contract includes design (coordinating with AIHC and CFR) and construction of a 2.550 km road section in Ilfov County. The estimated value is 454,818,229.43 RON (approx. EUR 91 million). The procedure is open with electronic submission required in Romanian. The deadline for tenders is 15 June 2026 at 12:00 (Romanian local time). The contract duration is 90 months. Award criteria are price (40%) and quality (60%) with various sub-criteria. Only one lot is identified (LOT-0000), though structured data entries hint at multiple lots but lack detail. No procurement documents beyond the notice were analyzed.
Strengths
Documents available
Open procedure
0 days left
Risks
Submission deadline in 0 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Electronic submission via e-licitatie.ro is required.
- Tenders must be submitted in Romanian (RON).
- Variants are not allowed.
Award Criteria
Pretul ofertei
Punctajul se acorda astfel: a) Pentru cel mai scazut dintre preturi se acorda punctajul maxim alocat; b) Pentru celelalte preturi ofertate punctajul P(n) se calculeaza proportional, astfel: P(n) = (Pret minim ofertat / Pret n) x punctaj maxim alocat.
| Criterion | Type |
|---|---|
Pretul ofertei Punctajul se acorda astfel: a) Pentru cel mai scazut dintre preturi se acorda punctajul maxim alocat; b) Pentru celelalte preturi ofertate punctajul P(n) se calculeaza proportional, astfel: P(n) = (Pret minim ofertat / Pret n) x punctaj maxim alocat. | Price |
Buyer
Name
COMPANIA NATIONALA DE INVESTITII RUTIERE S.A.
Location
Bucuresti, ROU
Website
Buyer profile
Identifier
36727850
Lots (1)
Design (coordinating with AIHC and CFR) and execution of the road link between the North Bucharest Beltway and the future Terminal 2 of Henri Coanda International Airport. The road is 2.550 km long, starting at intersection with DJ 200B and ending at the ramp over the Beltway.
Procurement Details
Publication
21 May 2026
Deadline
15 Jun 2026, 12:00
Procedure
open
Contract
works
Duration
90 MONTH
Language
RON
Publication #
351833-2026
Classification
Performance: Romania
Documents (2)
Opportunity Score
Confidence: 50%
Complexity: high
0 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation