Tenderwize
Back to tender search

Switzerland – Battery chargers – N01.F2 MP-220045 - Klimapaket Bern - E-LKW Werkhof Bern (ID 12008)

Office fédéral des routes (OFROU) - Division Infrastructure routière Ouest - Filiale ThouneThun, SwitzerlandNot disclosed22 days leftopen
50

Opportunity Score

Confidence: 30%

Complexity: medium

22 days

Deadline

supplies

Contract

Deep Portfolio Analysis

  • Company fit score
  • Missing certificates
  • Eligibility blockers
  • Bid / No-Bid recommendation
Create account for AI analysis

AI Analysis Summary

Moderate opportunity

This tender by the Swiss Federal Roads Office (OFROU) seeks a contractor for the first phase of expanding electric vehicle charging infrastructure at the Wankdorf maintenance center. Scope includes supply and installation of 8 charging points, 2 mobile charging stations, a battery storage system (min 800 kWh), load management system, integration, maintenance, and training. The contract is for supplies with an open procedure. Only one lot is identified; additional lots in structured data appear to be artifacts. Submission must be in German, paper-only, by 2026-07-07. Estimated value is not disclosed. Procurement documents are referenced on simap.ch but not analyzed.

Strengths

Open procedure

Medium complexity

22 days left

Risks

No procurement documents available

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

  • German language for documentation and training
  • Paper-based submission only (no electronic submission allowed)
  • Battery storage minimum 800 kWh

Award Criteria

CA 1 PRIX

Prix de l’offre corrigé. Les indications figurant dans le bordereau des prestations et sur la page de garde de l’offre font foi.

Type: Price

Buyer

Name

Office fédéral des routes (OFROU) - Division Infrastructure routière Ouest - Filiale Thoune

Location

Thun, CHE

Identifier

fd81892d-508f-4bbf-8335-a85525733cf4

Lots (1)

#LOT-0000N01.F2 MP-220045 - Klimapaket Bern - E-LKW Werkhof Bern (ID 12008)

Supply and installation of charging infrastructure: 8 fixed charging points, 2 mobile charging stations, ceiling-mounted power supply, battery storage system (min 800 kWh), load management system, integration into energy concept, remote access, commissioning, maintenance, emergency service, documentation, and training in German. Performance in Switzerland.

31158100, 31155000CHE

Procurement Details

Publication

20 May 2026

Deadline

07 Jul 2026, 21:59

Procedure

open

Contract

supplies

Language

DEU, FRA, ITA

Publication #

348782-2026

Classification

Performance: Switzerland