Italy – River regulation and flood control works – SISMA 2016 - Ordinanza Speciale del C.S.R. n.23 del 13/08/2021 - Interventi di Mitigazione del Rischio Idraulico nei Comuni di Castelsantangelo sul Nera, Ussita e Visso, nella zona epicentrale marchigiana maggiormente colpita dagli eventi sismici del 2016 - Interventi in Comune di Castelsantangelo sul Nera (MC)
Opportunity Score
Confidence: 50%
Complexity: medium
7 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Open tender by Ufficio Speciale per la Ricostruzione Marche - CUC for river regulation and flood control works in Castelsantangelo sul Nera (MC), Italy, as part of post-earthquake reconstruction (SISMA 2016). Single lot with estimated value €9,454,931.51. Deadline for receipt of tenders: 2026-06-22 09:00 (CET). Award based on quality (80%) and price (20%). Submission must be in Italian, via electronic portal.
Strengths
Documents available
Open procedure
Medium complexity
Risks
Submission deadline in 7 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Tenders must be submitted electronically via the portal: Open portal
- Submission language: Italian only.
- Variants are not allowed.
Buyer
Name
UFFICIO SPECIALE PER LA RICOSTRUZIONE MARCHE - CUC
Location
ANCONA (AN), ITA
Buyer profile
Identifier
93151650426
Lots (1)
Flood risk mitigation works in Castelsantangelo sul Nera (MC), including river regulation and flood control. CPV: 45246000 (River regulation and flood control works), 45233144 (Flood-defences works), 45233227 (Surface work for roads), 45246400 (Flood-prevention works).
Procurement Details
Publication
19 May 2026
Deadline
22 Jun 2026, 09:00
Procedure
open
Contract
works
Language
ITA
Publication #
345960-2026
Classification
Performance: Italy
Documents (2)
Opportunity Score
Confidence: 50%
Complexity: medium
7 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation