Romania – Cycle path construction work – Reabilitare, modernizare si extindere a infrastructurii de mobilitate urbană durabilă pe raza Sectorului 3
Opportunity Score
Confidence: 40%
Complexity: high
11 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This open procedure by Sector 3 of Bucharest, Romania, seeks a contractor for a 4-year framework agreement to rehabilitate, modernize, and expand sustainable urban mobility infrastructure, including approximately 115 km of bicycle paths, road and pedestrian reconfiguration, parking, smart transport systems, and related works. The total estimated maximum value is 263,421,091.50 RON (VAT excluded), with a minimum of 4,858,408.25 RON. The framework anticipates about 12 subsequent contracts (each up to 6 months). Award is based on price (64%) and quality (36%). Submission is electronic via SEAP by 26 June 2026, 12:00 (Bucharest time), in Romanian. Only one lot is identified. Key risks include no analyzed tendering documents (missing detailed specifications, technical requirements, and model contracts), high value and complexity, and strict Romanian registration/authorization requirements for non-residents.
Strengths
Documents available
Open procedure
11 days left
Risks
Submission deadline in 11 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Framework agreement with a maximum value of 263,421,091.50 RON (VAT excluded), minimum 4,858,408.25 RON
- Open procedure; electronic submission via SEAP (e-licitatie.ro)
- Tenders in Romanian only
Award Criteria
Pretul ofertei
Punctajul se acorda astfel: a) Pentru cel mai scazut dintre preturi se acorda punctajul maxim alocat; b) Pentru celelalte preturi ofertate punctajul P(n) se calculeaza proportional, astfel: P(n) = (Pret minim ofertat / Pret n) x punctaj maxim alocat.
| Criterion | Type |
|---|---|
Pretul ofertei Punctajul se acorda astfel: a) Pentru cel mai scazut dintre preturi se acorda punctajul maxim alocat; b) Pentru celelalte preturi ofertate punctajul P(n) se calculeaza proportional, astfel: P(n) = (Pret minim ofertat / Pret n) x punctaj maxim alocat. | Price |
Buyer
Name
SECTOR 3 AL MUNICIPIULUI BUCURESTI
Location
Bucuresti, ROU
Website
Buyer profile
Identifier
4420465
Lots (1)
Framework agreement for the execution of works: rehabilitation, modernization, and extension of sustainable urban mobility infrastructure in Sector 3, Bucharest. Main works: coherent bicycle path network (~115 km), reconfiguration of road and pedestrian platforms, ground parking (including bike parking), road safety solutions, intelligent transport systems, and related installations, green spaces, urban furniture. The framework runs 48 months, with an estimated 12 subsequent contracts (3-5 per year), each with a maximum duration of 6 months. Maximum framework value: 263,421,091.50 RON; minimum: 4,858,408.25 RON; largest subsequent contract: 41,158,574.25 RON; smallest: 4,715,475.75 RON.
Procurement Details
Publication
17 May 2026
Deadline
26 Jun 2026, 12:00
Procedure
open
Contract
works
Duration
48 MONTH
Language
RON
Publication #
338704-2026
Classification
Performance: Romania
Documents (2)
Opportunity Score
Confidence: 40%
Complexity: high
11 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation