France – Building construction work – Construction du groupe scolaire de la ZAC du quartier de l'Ecole Polytechnique
Opportunity Score
Confidence: 30%
Complexity: high
28 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This notice from Etablissement public d'aménagement Paris Saclay concerns the construction of a school group in the ZAC du quartier de l'Ecole Polytechnique in Palaiseau, France. It is an open works procedure with 10 lots covering various construction trades (structural works, partitions, joinery, metalwork, ceilings, flooring, painting, HVAC, electrical, kitchen equipment). The tender deadline is 2026-07-13 at 10:00 CET. No estimated value, selection criteria, or award criteria are provided in the available data. Procurement documents are referenced but not analyzed.
Strengths
Documents available
Open procedure
28 days left
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Tenders must be submitted electronically via the provided platform
- All documents must be in French
- No variants allowed
Buyer
Name
Etablissement public d'aménagement Paris Saclay
Location
Palaiseau, FRA
Website
Identifier
62656
Lots (10)
Structural works, partitions, and external works including site installation, earthworks, foundations, masonry, timber structure, roofing, waterproofing, cladding, exterior joinery, green spaces, lifts, and roads. Duration 54 months with optional tranches for PV glazing, osier tunnel, and modular equipment.
Partition and lining works. Duration 30 months.
Interior joinery works. Duration 30 months.
Procurement Details
Publication
17 May 2026
Deadline
13 Jul 2026, 10:00
Procedure
open
Contract
works
Duration
54 MONTH
Language
FRA
Publication #
338244-2026
Classification
Performance: France
Documents (2)
Opportunity Score
Confidence: 30%
Complexity: high
28 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation