Belgium – Clinic construction work – Aanstelling aannemer voor nieuwbouw revalidatieziekenhuis - Engineering & Build
Opportunity Score
Confidence: 40%
Complexity: high
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This is a negotiated procedure with call for competition for an Engineering & Build contract to construct a new rehabilitation hospital (Revalidatieziekenhuis) in Mechelen, Belgium, on behalf of Nationaal Multiple Sclerose Centrum VZW. The project involves approximately 18,400 m² gross floor area, including a basement with therapy pool and a tunnel connection to the adjacent Sint-Maarten Hospital. The contract is a single lot (LOT-0001) and is not a framework agreement or DPS. The tender is conducted in Dutch only. No estimated value is provided. The deadline for submission is 13 July 2026, 09:00 local time.
Strengths
Documents available
Electronic submission
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Contractor must have a recent (not older than 3 months) credit rating report from Graydon with a risk score of 51 or higher (classification C or D leads to disqualification)
- For consortia, each member must meet the financial standing requirement individually
- Submission must be in Dutch (NLD)
Buyer
Name
Nationaal Multiple Sclerose Centrum VZW
Location
Melsbroek, BEL
Website
Identifier
BE0410.338.110
Lots (1)
Realization of a fully operational new rehabilitation hospital building for the Nationaal Multiple Sclerose Centrum, including external works but excluding medical and non-medical loose equipment. The contractor is responsible for the complete execution based on his own study, the contract documents, and the environmental permit. The contract is a result obligation (Engineering & Build) without classic design components. The project must be realized within a fixed budget, with responsibility and liability for the contractor. Key words: sustainable, contemporary, innovative, perfectly coordinated, optimized in operational costs. The contractor must establish a BIM execution model.
Procurement Details
Publication
12 May 2026
Deadline
—
Procedure
open
Contract
works
Language
NLD
Publication #
329702-2026
Classification
Performance: Belgium
Documents (2)
Opportunity Score
Confidence: 40%
Complexity: high
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation