Germany – Interruptible power supplies – Strombeschaffung und -belieferung von Elektrolyseuren und ernergiewirtschaftliche Dienstleistungen im RFNBO-Kontext für den Zeitraum 12/2026 – 12/2029
Opportunity Score
Confidence: 55%
Complexity: high
3 days
Deadline
supplies
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This tender by RVK | Regionalverkehr Köln GmbH (Germany) seeks to procure electricity via Power Purchase Agreements (PPAs) for two electrolyzers (2 MW each) to produce RFNBO-compliant hydrogen for bus fleet. The tender is divided into two lots: Lot 2.1 for photovoltaic PPA and Lot 2.2 for wind power PPA. Contract duration is 36 months (Dec 2026 – Dec 2029). The procedure is open, electronic submission via subreport, language German. Estimated value not provided.
Strengths
Documents available
Open procedure
3 days left
Risks
Submission deadline in 3 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Bidder must be operator of a PV (Lot 2.1) or wind (Lot 2.2) plant in DE-LU market area
- Minimum annual feed-in volume: 5,800 MWh (PV) or 10,500 MWh (wind)
- For new plants: proof of planning status (P90 yield analysis, permits, financing) by bid deadline
Buyer
Name
RVK | Regionalverkehr Köln GmbH
Location
Köln, DEU
Website
Identifier
Berichtseinheit-ID 00011059
Lots (2)
Supply of electricity from one or more photovoltaic plants via a corporate PPA (cPPA). Physical delivery with transfer of guarantees of origin. Minimum annual feed-in volume: 5,800 MWh. For existing plants: historical load data for last 5 years; for new plants: P90 yield analysis, building permit, financing commitment, and at least one reference for similar PV project (≥3,000 MWh/year) within last 5 years.
Supply of electricity from one or more wind turbines via a corporate PPA (cPPA). Physical delivery with transfer of guarantees of origin. Minimum annual feed-in volume: 10,500 MWh. For existing plants: historical load data for last 5 years; for new plants: P90 yield analysis based on WindPro or similar, BImSchG permit, financing commitment, and at least one reference for similar wind project (≥5,000 MWh/year) within last 5 years.
Procurement Details
Publication
12 May 2026
Deadline
18 Jun 2026, 10:00
Procedure
open
Contract
supplies
Language
DEU
Publication #
328893-2026
Classification
Performance: Germany
Documents (2)
Opportunity Score
Confidence: 55%
Complexity: high
3 days
Deadline
supplies
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation