Tenderwize
Back to tender search

Italy – Architectural, engineering and planning services – TB IS 05-2026_S.42.11_Potenziamento delle corsie preferenziali del Metrobus Oltradige sulla S.S. 42 dal km 236+200 al km 238+600 (Comune di Appiano s.S.d.V)

Autonome Provinz Bozen - Abteilung TiefbauBolzano/Bozen, ItalyEUR 1,466,964 / ~EUR 1,466,9642 days leftopen
50

Opportunity Score

Confidence: 70%

Complexity: medium

2 days

Deadline

services

Contract

Deep Portfolio Analysis

  • Company fit score
  • Missing certificates
  • Eligibility blockers
  • Bid / No-Bid recommendation
Create account for AI analysis

AI Analysis Summary

Moderate opportunity

This tender from Provincia Autonoma di Bolzano (Italy) seeks architectural and engineering services for upgrading metrobus preferential lanes on SS.42 in Appiano/Eppan. The work includes planning, safety coordination, topographic surveys, expropriation documents, and optional construction management/safety coordination, using BIM methodology. The tender is split into at least two lots, with Lot 1 covering the main services and Lot 3 (unclear) covering design, construction management, and safety coordination. The estimated total value is €1,466,964.21. Submission is electronic via bandi-altoadige.it, with languages Italian and German (per lot). The deadline is 17 June 2026.

Strengths

Documents available

Open procedure

Medium complexity

Risks

Submission deadline in 2 days

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

  • Electronic submission via Open portal
  • Submissions allowed in Italian (ITA) and/or German (DEU) depending on lot
  • Compliance with Italian procurement code D.Lgs. n. 36/2023, Art. 100

Buyer

Name

Autonome Provinz Bozen - Abteilung Tiefbau

Location

Bolzano/Bozen, ITA

Identifier

00390090215

Lots (2)

#LOT-0001TB IS 05-2026_S.42.11_Potenzierung der Vorzugspuren Metrobus Überetsch auf der S.S. 42 von Km 236+200 bis Km 238+600 (Gemeinde Eppan a.d.W)

Services include planning and safety coordination in the design phase (including topographic surveys and expropriation documents) with optional construction management and safety coordination in the execution phase, according to BIM methodology.

EUR 1,466,964.2171240000ITA

Services include planning, construction management, and safety coordination (lot 3) according to BIM methodology. This lot appears to have separate submission in German and price-only award criteria.

71240000

Procurement Details

Publication

12 May 2026

Deadline

17 Jun 2026, 10:00

Procedure

open

Contract

services

Duration

255 DAY

Language

ITA, DEU

Publication #

326748-2026

Classification

Performance: Italy

Documents (2)