Poland – Construction work – Zaprojektowanie i wykonanie zadań w zakresie małej retencji na potrzeby Nadleśnictwa Jamy
Opportunity Score
Confidence: 60%
Complexity: high
8 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Open tender by Nadleśnictwo Jamy (Poland) for design and construction of 5 small water retention projects (lots) in forest areas, co-financed by EU FEnIKS program. Submission deadline 2026-06-23, electronic via e-Zamówienia. Price 60% and warranty period 40% as award criteria. Strict experience and qualification requirements per lot. Estimated value not disclosed.
Strengths
Documents available
Open procedure
8 days left
Risks
Submission deadline in 8 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Open procedure, electronic submission via e-Zamówienia platform (Open portal).
- Bids must be in Polish (POL).
- Tenderer may bid for one or more lots; each lot must be fully covered.
Buyer
Name
Nadleśnictwo Jamy
Location
Jamy 5, POL
Website
Buyer profile
Identifier
8760005131
Lots (5)
Design and construction of a weir on the main drainage ditch in Łąkorz, gmina Biskupiec, powiat nowomiejski. Minimum experience: one contract for similar works ≥ 500,000 PLN gross. Bid bond 20,500 PLN.
Design and construction of damming devices system "Ols" in Łąkorz. Minimum experience: one contract for similar works ≥ 300,000 PLN gross. Bid bond 12,400 PLN.
Design and construction of damming devices system "Rurki" in Łąkorz. Minimum experience: one contract for similar works ≥ 550,000 PLN gross. Bid bond 22,500 PLN.
Procurement Details
Publication
11 May 2026
Deadline
23 Jun 2026, 06:00
Procedure
open
Contract
works
Duration
15 MONTH
Language
POL
Publication #
324175-2026
Classification
Performance: Poland
Documents (2)
Opportunity Score
Confidence: 60%
Complexity: high
8 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation