Denmark – Works for complete or part construction and civil engineering work – Etablissement- og Terrænkommandoen - Dolphin Apron Aalborg
Opportunity Score
Confidence: 70%
Complexity: medium
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Restricted procedure for construction works at Aalborg Airbase (Dolphin Apron). Replacement of concrete slabs without steel fibers to avoid FOD risk and adjust crossfalls. Estimated value DKK 65M, duration 65 months. Pre-qualification required with financial criteria (avg turnover >130M DKK, positive equity, solvency >15%).
Strengths
Documents available
Medium complexity
Electronic submission
Risks
Restricted procedure — pre-qualification required
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Pre-qualification via ESPD
- Average annual turnover ≥ 130M DKK over last 3 fiscal years
- Positive equity in last fiscal year
Buyer
Lots (1)
Replacement of existing concrete slabs on the Dolphin Apron at Aalborg Airbase with new concrete without steel fibers to eliminate FOD risk. Also adjustment of crossfalls to improve loading/unloading operations.
Procurement Details
Publication
11 May 2026
Deadline
—
Procedure
restricted
Contract
works
Duration
65 MONTH
Language
DAN
Publication #
323476-2026
Classification
Performance: Denmark
Documents (2)
Opportunity Score
Confidence: 70%
Complexity: medium
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation