Germany – Construction work – L257 Ersatzneubau Rurbrücke Hoven

Landesbetrieb Straßenbau NRW - Regionalniederlassung Ville-EifelEuskirchen, GermanyNot disclosed1 days leftopen
45

Opportunity Score

Confidence: 70%

Complexity: medium

1 days

Deadline

works

Contract

SME suitable

Deep Portfolio Analysis

  • Company fit score
  • Missing certificates
  • Eligibility blockers
  • Bid / No-Bid recommendation
Create account for AI analysis

AI Analysis Summary

Moderate opportunity

This tender by Landesbetrieb Straßenbau NRW is for the replacement of the Rurbrücke bridge on L257 between Hoven and Birkesdorf, Germany. The project includes demolition of two existing bridges, construction of a new three-span bridge with precast prestressed concrete girders, road reconstruction, drainage, and utility relocation. The tender is an open procedure with a single lot (LOT-0001). The deadline for receipt of tenders is 2026-06-16T07:00:00Z. The contract duration is 650 days. No estimated value is provided. Eligibility criteria include personal standing, technical and professional capacity, and financial standing. Award criteria are not specified. The tender is SME-suitable and requires electronic submission in German. No procurement documents beyond the notice were analyzed.

Strengths

Documents available

Open procedure

Medium complexity

Risks

Submission deadline in 1 days

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

  • Open procedure; electronic submission required via e-Vergabe platform
  • Submission language: German
  • Tender validity: 63 days (from submission deadline)

Buyer

Name

Landesbetrieb Straßenbau NRW - Regionalniederlassung Ville-Eifel

Location

Euskirchen, DEU

Identifier

05515-09001-58

Lots (1)

#LOT-0001L257 Ersatzneubau Rurbrücke Hoven

Demolition of two existing four-span bridges over the Rur, construction of a new three-span bridge with T-shaped prestressed concrete precast girders and a cast-in-place slab (approx. 25 cm thick), founded on large bored piles. Full reconstruction of L257 over approx. 300 m, including drainage and two discharge points into the Rur. Demolition and new construction of a main combined sewer (DN 1500) crossing the structure, approx. 100 m long. Removal and reinstallation of traffic signs, markings, and safety devices.

45000000, 45221111, 45231300, 45233100DEU

Procurement Details

Publication

07 May 2026

Deadline

16 Jun 2026, 07:00

Procedure

open

Contract

works

Duration

650 DAY