Germany – Heat-transfer station construction work – Brainergy Park Energie GmbH wg. Elektrische Energieversorgung (Los 6) Leittechnik (Los 7)
Opportunity Score
Confidence: 35%
Complexity: medium
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This tender from Brainergy Park Energie GmbH concerns the construction of an energy center in Jülich, Germany, divided into two lots: Lot 6 (Elektrische Energieversorgung) and Lot 7 (Leittechnik). The procedure is a negotiated procedure with call for competition under the Utilities Directive. Key features include strict eligibility criteria (minimum turnover, staff, insurance, and references), award based on quality (40%) and price (60%) for each lot, and a submission deadline of 2026-06-05 10:00. No estimated value is provided, and procurement documents were not analyzed, increasing uncertainty.
Strengths
Documents available
Medium complexity
Electronic submission
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Negotiated procedure with call for competition (neg-w-call).
- Bidders may apply for one or both lots; maximum lots awarded: 2.
- Variants not allowed.
Buyer
Name
Brainergy Park Energie GmbH
Location
Jülich, DEU
Buyer profile
Identifier
+49 152 09408180
Lots (2)
Scope includes electrification of transformer stations, first 7 of 11 heat pumps, provisional network pumps, and pressure maintenance. Part of the energy center construction for the Brainergy Park Jülich.
Scope includes control technology for the energy center. Part of the energy center construction for the Brainergy Park Jülich.
Procurement Details
Publication
06 May 2026
Deadline
—
Procedure
open
Contract
works
Language
DEU
Publication #
315443-2026
Classification
Performance: Germany
Documents (2)
Opportunity Score
Confidence: 35%
Complexity: medium
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation