Italy – Construction, foundation and surface works for highways, roads – APPALTO INTEGRATO,DA REDIGERE E RESTITUIRE IN MODALITA' B.I.M., PER L’AFFIDAMENTO DELLA PROGETTAZIONE ESECUTIVA E DELL’ESECUZIONE DEI LAVORI (LOTTO 1) DI COMPLETAMENTO SSV COLLEGAMENTO A2/SAN ROBERTO/CAMPO CALABRO/PIANI D'ASPROMONTE E LOTTO 2 (OPZIONE) COLLEGAMENTO FRA SANTA LUCIA DI CAMPO CALABRO E FIUMARA DI MURO ED IL COLLEGAMENTO CON LE AREE INTERNE MONTANE.
Opportunity Score
Confidence: 40%
Complexity: high
0 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Integrated design and build contract (BIM required) for road completion works in Reggio Calabria, Italy. Two lots: Lot 1 (main) for SSV connection and Lot 2 (option) for additional connections. Open procedure. Submission deadline 15 June 2026.
Strengths
Documents available
Open procedure
0 days left
Risks
Submission deadline in 0 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Integrated design and build contract
- BIM compliance (Art. 43 D.Lgs. 36/2023)
- Electronic submission via platform
Buyer
Name
Citta' Metropolitana di Reggio Calabria
Location
Reggio di Calabria, ITA
Website
Identifier
80000100802
Lots (2)
Design and execution of road completion for the SSV connection A2/San Roberto/Campo Calabro/Piani d'Aspromonte. Duration 730 days. BIM required.
Optional lot for connection between Santa Lucia di Campo Calabro and Fiumara di Muro, and connection with internal mountain areas. Duration 1140 days. BIM required.
Procurement Details
Publication
05 May 2026
Deadline
15 Jun 2026, 10:00
Procedure
open
Contract
works
Duration
730 DAY
Language
ITA
Publication #
311502-2026
Classification
Performance: Italy
Documents (2)
Opportunity Score
Confidence: 40%
Complexity: high
0 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation