Germany – Construction work for buildings relating to health – Ederhof / Planung u. Errichtung schlüsselfertig + betriebsbereit durch TU auf Grundlage einer FLB
Opportunity Score
Confidence: 35%
Complexity: high
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
The tender is for the turnkey planning and construction (Totalunternehmer) of a 7-storey timber hybrid building for a rehabilitation center for children after organ transplantation, located in Stronach/Osttirol, Austria. The buyer is the Rudolf-Pichlmayr-Stiftung, a German foundation. The project includes execution planning from LPH 5 onward based on a functional specification and design details. The procedure is a negotiated procedure with call for competition (neg-w-call), with a shortlist of 3-5 candidates. Estimated value is not provided. The construction period is 12 months. Only one lot is identified.
Strengths
Documents available
Electronic submission
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Total contractor (TU) must provide planning (LPH 5 onward) and construction
- Lump-sum fixed price offer mandatory
- Cost target must be met; otherwise tender may be cancelled or only planning deepening phase awarded
Buyer
Name
Rudolf-Pichlmayr-Stiftung
Location
Hannover, DEU
Website
Buyer profile
Identifier
10368
Lots (1)
Design and construction of a 7-storey (4 above, 3 below) building in timber skeleton construction with concrete parts for slope, earthquake, and fire safety. Approx. 3,000 m² NUF. Two functional areas: a vertical tower (administration, therapy, education) and a horizontal residential wing for patients and families. The bidder must provide a lump-sum fixed price meeting the foundation's cost target. If not achievable, the foundation may cancel or order a planning deepening phase only.
Procurement Details
Publication
05 May 2026
Deadline
—
Procedure
open
Contract
works
Duration
12 MONTH
Language
DEU
Publication #
308980-2026
Classification
Performance: Austria
Documents (2)
Opportunity Score
Confidence: 35%
Complexity: high
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation