This tender, issued by Société Néo-Calédonienne d'Energie (ENERCAL) via EDF as project manager, is for the study, design, and construction of a 100 MW pumped storage hydroelectric plant (STEP) near the Tontouta river in New Caledonia. The procedure is a two-phase process: Phase 1 (ECI contract) includes detailed design, risk analysis, and preparation of an EPC contract; Phase 2 is an optional EPC contract for full construction. The tender is published under the Utilities Directive (2014/25/EU). Only a TED XML notice was analyzed; no procurement documents were extracted.
Strengths
Electronic submission
Risks
No procurement documents available
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Multi-stage procedure (ECI then optional EPC)
- Electronic submission via Open portal
- Language: French (FRA)
Buyer
Name
Société Néo-Calédonienne d'Energie
Location
Nouméa, NCL
Website
Buyer profile
Identifier
103 916 334
Lots (3)
Phase 1: ECI contract for detailed design (APD), methods/planning, risk analysis, price confirmation, and preparation of EPC specifications. Phase 2 (optional): EPC contract for full construction including upper basin, lower basin, penstock, powerhouse, and grid connection.
Additional CPV for hydraulic structures construction work (45248000).
Additional CPV for engineering consultancy services (71310000).
Procurement Details
Publication
29 Apr 2026
Deadline
—
Procedure
open
Contract
works
Duration
12 MONTH
Language
FRA
Publication #
299334-2026
Classification
Documents (1)
Opportunity Score
Confidence: 30%
Complexity: high
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation