Tenderwize
Back to tender search

Spain – Lifts, skip hoists, hoists, escalators and moving walkways – Suministro, instalación y mantenimiento integral de equipos de elevación en las estaciones de Cerdanyola del Vallès, Sabadell sud, Torre del Baró, Vilanova i la Geltrú, Terrasa, Les Franqueses-Granollers Nord, Montmelo y Vilassar del Mar (Rodalies de Barcelona)

Dirección General de Renfe Viajeros Sociedad Mercantil Estatal, S.A.Madrid, SpainEUR 6,034,194 / ~EUR 6,034,1940 days leftopen
55

Opportunity Score

Confidence: 40%

Complexity: medium

0 days

Deadline

supplies

Contract

Deep Portfolio Analysis

  • Company fit score
  • Missing certificates
  • Eligibility blockers
  • Bid / No-Bid recommendation
Create account for AI analysis

AI Analysis Summary

Moderate opportunity

This tender by Renfe Viajeros (Spain) covers the supply, installation, and comprehensive maintenance of lifting equipment at nine railway stations in the Barcelona area for a 7-year period. The structured data shows three lots, but only the first is fully defined; the XML notice confirms a single lot. Estimated value is EUR 6,034,193.53. Submission deadline is 2026-06-15T10:00 (Spanish time). Electronic submission is required. Award criteria include quality (technical documentation) and price, with weights 1, 70, and 29 as per the XML notice. Key selection criteria include annual turnover, reference works, and technical equipment. A provisional guarantee of EUR 120,683.87 is required. No full procurement documents were analyzed.

Strengths

Documents available

Open procedure

Medium complexity

Risks

Submission deadline in 0 days

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

  • Electronic submission required.
  • Submission language: Spanish (SPA).
  • Deadline for receipt of tenders: 2026-06-15T10:00:00 (local time).

Buyer

Name

Dirección General de Renfe Viajeros Sociedad Mercantil Estatal, S.A.

Location

Madrid, ESP

Buyer profile

Open profile

Identifier

50409810076841

Lots (3)

#LOT-0000Suministro, instalación y mantenimiento integral de equipos de elevación en las estaciones de Cerdanyola del Vallès, Sabadell sud, Torre del Baró, Vilanova i la Geltrú, Terrasa, Les Franqueses-Granollers Nord, Montmelo y Vilassar del Mar (Rodalies de Barcelona)

Supply, installation and comprehensive maintenance of lifting equipment across nine stations. CPV: 42416000 (lifts), 50740000 (lift maintenance), 50750000 (escalator maintenance). Duration 7 years. Main lot.

EUR 6,034,193.5342416000, 50740000, 50750000ESP

Incomplete lot data from structured data; no title, description or deadline provided. Additional CPV: 50750000.

50750000

Incomplete lot data from structured data; no title, description, CPV or deadline provided. Award criteria: quality (weight poi-exa).

Procurement Details

Publication

29 Apr 2026

Deadline

15 Jun 2026, 10:00

Procedure

open

Contract

supplies

Duration

7 YEAR

Language

SPA

Publication #

298547-2026

Classification

Performance: Spain

Documents (2)