Germany – Electrical wiring and fitting work – MPI für Intelligente Systeme, Neubau Cyber Valley: Stromversorgung

Max-Planck-Gesellschaft Abt.IIIMünchen, GermanyEUR 1 / ~EUR 13 days leftopen
55

Opportunity Score

Confidence: 40%

Complexity: medium

3 days

Deadline

works

Contract

Deep Portfolio Analysis

  • Company fit score
  • Missing certificates
  • Eligibility blockers
  • Bid / No-Bid recommendation
Create account for AI analysis

AI Analysis Summary

Moderate opportunity

Open tender by Max-Planck-Gesellschaft for electrical power supply installation at MPI für Intelligente Systeme in Stuttgart Büsnau. Single lot covering medium-voltage switchgear, transformers, cables, low-voltage distribution, raised floor, rooftop PV (155kWp), and integration. Mandatory product specifications (Janitza, Siemens). Award criterion: price only. Estimated value ambiguous (€1, likely placeholder). Deadline: 18 June 2026. Submission exclusively via eVergabe platform.

Strengths

Documents available

Open procedure

Medium complexity

Risks

Submission deadline in 3 days

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

  • Mandatory product specifications: Janitza for energy data system, Siemens for network protection (due to campus system extension)
  • Tenders must consider external disruptions (e.g., pandemic, war) affecting material availability, labor, etc.
  • Questions must be submitted via eVergabe messaging system before deadline

Award Criteria

Preis

Preis

Type: Price

Buyer

Name

Max-Planck-Gesellschaft Abt.III

Location

München, DEU

Website

www.mpg.de

Buyer profile

Open profile

Identifier

e7a1ce47-7cae-456b-936c-6931c9d8feb6

Lots (1)

#LOT-0001MPI für Intelligente Systeme, Neubau Cyber Valley: Stromversorgung

Supply and installation of electrical power systems: air-insulated medium-voltage switchgear (5 fields), 2 cast-resin transformers, network protection devices, medium-voltage cables, low-voltage main distribution (17 fields), raised floor, rooftop PV system (155kWp), low-voltage energy cables, accessories, and integration into existing 10kV and PV systems. Mandatory product specifications for Janitza (energy data system extension) and Siemens (network protection extension). Duration 300 working days.

EUR 145311000, 31682300DEU

Procurement Details

Publication

29 Apr 2026

Deadline

18 Jun 2026, 08:00

Procedure

open

Contract

works

Duration

300 DAY

Language

DEU

Publication #

297196-2026

Classification

Performance: Germany

Documents (2)