Hungary – Construction work for water projects – Szeged Algyői főcsatorna fejlesztés IV. ütem
Opportunity Score
Confidence: 40%
Complexity: high
3 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Open tender from Hungary for the development of the Algyői main channel (Phase IV) in Szeged, including dredging, embankment construction, structure renovation, and monitoring. Design-build contract under FIDIC Yellow Book. Single lot identified, but structured data shows additional incomplete lots (likely data extraction issues). No estimated value provided. Submission in Hungarian only. High financial threshold (min. 4 billion HUF turnover in water management works).
Strengths
Documents available
Open procedure
3 days left
Risks
Submission deadline in 3 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Design-build contract based on FIDIC Yellow Book
- Contractor is responsible for finalizing the indicative designs and obtaining permits
- Duration: max 24 months from contract award
Buyer
Name
Országos Vízügyi Főigazgatóság
Location
Budapest, HUN
Website
Buyer profile
Identifier
15796019241
Lots (1)
Main lot: dredging of Algyői main channel (0+000–2+200 km and 10+297–11+020 km), embankment construction (approx. 5,454 fm), reconstruction of structures (e.g., sluices, bridges), construction of new reinforced concrete structures, monitoring facilities, and dredging of about 25,000 m³ of sludge from a fish pond. Design-build responsibility under FIDIC Yellow Book. Duration 24 months.
Procurement Details
Publication
27 Apr 2026
Deadline
18 Jun 2026, 09:00
Procedure
open
Contract
works
Duration
24 MONTH
Language
HUN
Publication #
288612-2026
Classification
Performance: Hungary
Documents (2)
Opportunity Score
Confidence: 40%
Complexity: high
3 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation