Belgium – Nuclear safety equipment – Supply of Passive Autocatalytic Hydrogen Recombiners and Hydrogen Monitoring System for Armenian Nuclear Power Plant Unit 2
Opportunity Score
Confidence: 40%
Complexity: high
11 days
Deadline
supplies
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This open tender by the European Commission on behalf of Armenia seeks suppliers for nuclear safety equipment: Passive Autocatalytic Hydrogen Recombiners (Lot 1) and a Hydrogen Monitoring System (Lot 2) for Armenian Nuclear Power Plant Unit 2. The tender is funded by the EU and is part of Armenia's national action plan following the Fukushima-Daiichi accident. Only the notice is analyzed; procurement documents are not extracted.
Strengths
Documents available
Open procedure
11 days left
Risks
Submission deadline in 11 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Tender must be submitted electronically via the EU Funding and Tenders Portal.
- Submissions in English only.
- Bidders can bid for one or both lots (maximum 2 lots).
Buyer
Name
European Union, represented by the European Commission on behalf of and for the account of Armenia
Location
Brussels, BEL
Identifier
COM
Lots (2)
Design, manufacture and supply of a set of Passive Autocatalytic Hydrogen Recombiners and auxiliary tools with a total rated depletion rate of no less than 105 kg/h. Installation and commissioning by ANPP under supplier supervision.
Design, manufacture and supply of a Hydrogen Monitoring System and auxiliaries. Installation and commissioning by ANPP under supplier supervision.
Procurement Details
Publication
23 Apr 2026
Deadline
26 Jun 2026, 10:00
Procedure
open
Contract
supplies
Duration
24 MONTH
Language
ENG
Publication #
280692-2026
Classification
Performance: ARM
Documents (2)
Opportunity Score
Confidence: 40%
Complexity: high
11 days
Deadline
supplies
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation