Lithuania – Works for complete or part construction and civil engineering work – Paviršinių nuotekų tinklų ir valyklų statyba, rekonstrukcija ir remontas
Opportunity Score
Confidence: 45%
Complexity: high
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This is a Dynamic Purchasing System (DPS) for surface water drainage network and treatment plant construction, reconstruction, and repair works in Vilnius, Lithuania. The contracting authority is Grinda UAB. The DPS consists of 10 lots covering similar works, with a total estimated value of EUR 120,000,000. The procedure is restricted with electronic submission required in Lithuanian. The DPS duration is 60 months, ending on 2030-10-16. No tender deadline, selection criteria, award criteria, or specific documents are provided. The analysis is based solely on the structured tender data and the TED XML notice; no procurement documents were analyzed.
Strengths
Documents available
Electronic submission
High budget
Risks
Restricted procedure — pre-qualification required
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Electronic submission required
- Submission language: Lithuanian only
- Restricted procedure: requires initial selection phase
Buyer
Name
Grinda UAB (PV)
Location
Vilnius, LTU
Buyer profile
Identifier
120153047
Lots (10)
Construction, reconstruction, and/or repair of wastewater drainage networks; exceptional structures category.
Same scope as LOT-0001 but no specific title provided.
Same scope as LOT-0001 but no specific title provided.
Procurement Details
Publication
25 Feb 2026
Deadline
—
Procedure
restricted
Contract
works
Duration
60 MONTH
Language
LIT
Publication #
136214-2026
Classification
Performance: Lithuania
Documents (2)
Opportunity Score
Confidence: 45%
Complexity: high
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation