Awarded contractOpenWorksMalta
IMT006/2025 Connection for Safer Active Mobility Routes - Upgrading of shared use connection between Triq San Tumas and Triq Balbi, Marsa, including operation and maintenance of the project.
1 supplier awarded•1 lot awarded•€1.98M awarded
Buyer: Infrastructure Malta / Luqa, Malta
Published Aug 27, 2026Awarded Aug 26, 2026
Footbridge construction workConcreteConcrete products+4
Awarded value
€1.98M
Estimated value
€3.21M
Awarded at 62% of estimated value
Award date
Aug 26, 2026
Winners
1
Lots awarded
1
Winners
Lots awarded
| Lot | Title | Winner | Award value | Main CPV |
|---|---|---|---|---|
| LOT-0001 | RM CONSTRUCTION LTD | €2.0M | Footbridge construction work (45221113), Concrete (44114000) |