Awarded contractOpenWorksPoland
Budowa infrastruktury dla terenów inwestycyjnych w Lubinie w związku z planowaną Doliną Dronów i przyszłą transformacją po zakończeniu eksploatacji złóż miedzi” – ETAP 1 – budowa układu dróg.
1 supplier awarded•1 lot awarded•€13.80M awarded
Buyer: Gmina Miejska Lubin / Lubin, Poland
Published Aug 18, 2024Awarded Jul 23, 2024
Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatworkConstruction work for bridges and tunnels, shafts and subwaysEngineering design services+4
Awarded value
€13.80M
Estimated value
€13.80M
Awarded at 100% of estimated value
Award date
Jul 23, 2024
Winners
1
Lots awarded
1
Winners
PRO-TRA BUILDING Sp. z o.o.
1 lotWrocław, POL
€13.8M This contract
1 award notice•1 awarded lot•€13.80M total
Lots awarded
| Lot | Title | Winner | Award value | Main CPV |
|---|---|---|---|---|
| LOT-0001 | PRO-TRA BUILDING Sp. z o.o. | €13.8M | Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork (45230000), Construction work for bridges and tunnels, shafts and subways (45221000) |