Award tenders
Awarded contractFrameworkOpenWorksRomania

Acord Cadru pe 4 ani – Executarea lucrărilor de întreținere curentă “ Întreținere poduri, pasaje, podețe, tuneluri. Întreținerea zidurilor de sprijin și prevenirea efectelor inundațiilor – pe o perioadă de 4 ani Lot 1 - SDN Brașov, Lot 4 - SDN M. Ciuc, Lot 5 - SDN Sf. Gheorghe, Lot 6 - S.A.S.

4 lots awarded€1.05M awarded

Buyer: COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A. / Cluj-Napoca, Romania

Published Jul 16, 2024
Highway maintenance workBridge renewal construction workTunnel linings construction work+2

Awarded value

€1.05M

Estimated value

€1.05M

Awarded at 100% of estimated value

Award date

Winners

0

Lots awarded

4

Award values

Notice total

€1.05M

Sum of lot awards

€16.51M

TED notice total and lot-level values do not exactly match.

Winners

No winners specified.

Lots awarded

LotTitleWinnerAward valueMain CPV
LOT-0003
Framework
Not specified€5.1M

Highway maintenance work (45233139), Road-maintenance works (45233141)

LOT-0001
Framework
Not specified€4.7M

Highway maintenance work (45233139), Bridge renewal construction work (45221119)

LOT-0004
Framework
Not specified€3.5M

Highway maintenance work (45233139), Resurfacing works (45233251)

LOT-0002
Framework
Not specified€3.2M

Highway maintenance work (45233139), Tunnel linings construction work (45221248)