Awarded contractOpenWorksPoland
Rozbudowa drogi 1061K wraz z budową nowej drogi do spójnych terenów inwestycyjnych w Bukownie
1 supplier awarded•1 lot awarded•€17.35M awarded
Buyer: Powiat Olkuski / Olkusz, Poland
Published Apr 17, 2024Awarded Mar 27, 2024
Engineering works and construction worksConstruction work for bridgesRoad construction works+8
Awarded value
€17.35M
Estimated value
€17.35M
Awarded at 100% of estimated value
Award date
Mar 27, 2024
Winners
1
Lots awarded
1
Winners
STRABAG Infrastruktura Południe Sp. z o.o.
1 lotWrocław, POL
€17.4M This contract
7 award notices•7 awarded lots•€100.67M total
Lots awarded
| Lot | Title | Winner | Award value | Main CPV |
|---|---|---|---|---|
| LOT-0001 | STRABAG Infrastruktura Południe Sp. z o.o. | €17.4M | Engineering works and construction works (45220000) |