This is a Dynamic Purchasing System (DPS) established by Evida Service A/S (Danish gas utility) for the procurement of materials and equipment related to gas pipeline construction. The DPS is divided into seven categories (lots) covering steel pipes (under and over 3,000 tons), steel fittings, hotbends, insulating couplings, transition pieces, and valves. The total estimated value over the 10-year DPS lifetime is DKK 1,120,000,000. The system is open for admission of suppliers throughout its duration, with no fees for participation. Applicants must satisfy category-specific suitability requirements (two relevant references in the last three years) and cannot be excluded under Danish procurement law. No economic or financial capacity requirements are imposed. The procedure is restricted, and the award criterion for mini-tenders is the most economically advantageous tender. Submission deadline for initial admission is 2032-12-20 09:00.
Strengths
Medium complexity
Risks
Restricted procedure — pre-qualification required
No procurement documents available
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Applicants must not be covered by exclusion grounds under Danish Procurement Act sections 135, 136, and 137(1)(2)(4).
- Two relevant references within the last three years for the category applied for, documenting experience in gas supply projects.
- For Category 2, references must demonstrate delivery of 3,000 tons or more of steel pipes.
Buyer
Name
Evida Service A/S - HRSI
Location
Viborg, DNK
Identifier
40318941
Lots (3)
Supply of steel pipes (various thicknesses and lengths) for gas pipeline construction, with estimated annual consumption under 3,000 tons.
Supply of steel pipes (various thicknesses and lengths) for gas pipeline construction, with estimated annual consumption over 3,000 tons.
Supply of steel fittings for gas pipeline construction.
Procurement Details
Publication
22 Nov 2022
Deadline
—
Procedure
restricted
Contract
works
Language
ENG
Publication #
651872-2022
Classification
Opportunity Score
Confidence: 75%
Complexity: medium
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation