Spain – Construction work – Ejecución de obras habituales para prestación de los servicios públicos de competencia municipal mediante un sistema dinámico de adquisición.
Opportunity Score
Confidence: 65%
Complexity: high
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This notice establishes a Dynamic Purchasing System (DPS) for construction works commonly required by the Municipality of Vera, Spain. The DPS covers multiple categories of works (e.g., demolition, road paving, plumbing) with an estimated total value of €7,700,000 over a maximum duration of 4 years. The procedure is restricted, and participation requires electronic submission in Spanish. Admission is based on specific selection criteria, and contracts within the DPS will be awarded based on a combination of quality and price criteria.
Strengths
Documents available
Electronic submission
High budget
Risks
Restricted procedure — pre-qualification required
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Electronic submission is required.
- Submission language: Spanish.
- Selection based on capacity to act, professional liability insurance, annual turnover, and similar work references.
Buyer
Name
Pleno del Ayuntamiento de Vera
Location
Vera, ESP
Website
Buyer profile
Identifier
31094320153192
Lots (3)
The DPS covers a wide range of construction works commonly demanded by the municipality, as specified in the annex. Includes excavation, demolition, road paving, electrical installation, plumbing, finishing, and hiring of machinery.
No description provided.
No description provided.
Procurement Details
Publication
11 Aug 2024
Deadline
—
Procedure
restricted
Contract
works
Language
SPA
Publication #
482650-2024
Classification
Performance: Spain
Documents (1)
Opportunity Score
Confidence: 65%
Complexity: high
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation