Replacement of level crossing by new railway bridge and groundwater structure, including temporary level crossing
Originaltitel der Bekanntmachung
Germany – Railway bridge construction work – BÜ-Beseitigung durch Neubau EÜ u. GWW, km 30,393, einschl. temp. BÜ Allgäuer Straße, Str. 4570
Opportunity Score
Warum diese Bewertung?
Chance
52 / 100
Komplexität
78 / 100
Risikofaktoren
The bid deadline is only about one week after publication, which creates a high risk of insufficient preparation time.
DB prequalification or PQ-VOB may be required, and supporting evidence can be requested within 6 calendar days.
Tiefe Portfolioanalyse
Verwendet:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Überblick
Moderate opportunityWichtige Fakten
- Works contract
- 1 lot
- Duration until Apr 2030
- Construction works for a railway bridge replacement project in Memmingen, Germany.
- Temporary level crossing during the construction period.
Vollständige Zusammenfassung anzeigen
Open works contract for railway bridge replacement and related civil/track/level-crossing works in Memmingen, Germany. The tender is for one lot, price-only award, with electronic submission required. The notice indicates DB InfraGO AG as lead buyer and includes a strong prequalification/eligibility regime plus sanctions compliance. No contract value is provided in the structured data or XML notice.
Risiken
The bid deadline is only about one week after publication, which creates a high risk of insufficient preparation time.
DB prequalification or PQ-VOB may be required, and supporting evidence can be requested within 6 calendar days.
Analyse kann unvollständig sein
Nur ein Teil der Vergabeunterlagen wurde analysiert. Weitere Anforderungen, Zertifikate oder Einreichungsdokumente können in den übrigen Unterlagen enthalten sein.
Wichtige Anforderungen
Technical
- The tender is open procedure.
- Award is based on price only.
Administrative
- Electronic submission is required.
Zuschlagskriterien
Lot 1
Auftraggeber
Ort
Frankfurt Main, DEU
Kennung
fb197f94-7578-4673-8a57-4642ae120532
Tätigkeit
Railway services
Lose (1)
LOT-0001
Replacement of level crossing by new railway bridge and groundwater structure, including temporary level crossing
Single works lot in Memmingen for replacing the existing level crossing with a new railway bridge and groundwater structure, including a temporary level crossing during construction. The scope explicitly mentions side-positioned bridge construction, insertion in 2028, single-track and electrified railway conditions, reinforced-concrete construction, shoring/retaining box, and related railway/civil works. The lot information comes from structured data and XML notice.
Ort
Dauer
Kategorie
Zuschlagskriterien
Frist
Zuschlagsdetails
Preis
Zusätzliche CPV-Codes
Hinweis zum Wert
Originale TED-Daten anzeigen
Originaler Los-Titel
BÜ-Beseitigung durch Neubau EÜ u. GWW, km 30,393, einschl. temp. BÜ Allgäuer Straße, Str. 4570
Originale TED-Beschreibung
4570 km30,393 Memmingen; Ersatz BÜ d EÜ inkl. Bauzeitlichem Bahnübergang ab Mai 2027; Herstellung Brücke in seitlicher Lage; Einschub 2028; Eingleisig; Elektrifiziert; Grundwasserwanne; Dreizeilige EÜ; Stahlbetonbauweise; Verbaukasten
Vergabedetails
- Veröffentlichungsdatum
- 08 Jul 2026
- Sprachen
- German
Referenzmetadaten
- Rechtsgrundlage
- 32014L0025
Referenz-IDs
- Ausschreibungs-ID
- 475790-2026
Dokumente (1)
Ähnliche Ausschreibungen
Czechia – Road construction works – I/50 Bučovice, obchvat
Italy – Landscaping work for green areas – GL 2 2026 - Accordo Quadro con unico operatore ex art. 59 Codice per l'affidamento dei lavori afferenti agli interventi di mitigazione aggiuntiva in Comune di Paderno Dugnano di cui al DM 274/2014 - Opere rientranti nel c.d. Appalto principale
Germany – Road construction works – Kreuzungsfreier Ausbau Frankenschnellweg, Abschnitt West: Bauleistungen, Straßen- & Ingenieurbau
France – Retirement home construction work – Construction d'un nouvel EHPAD de 80 lits
Germany – Road construction works – Kreuzungsfreier Ausbau Frankenschnellweg, Abschnitt West: Bauleistungen, Straßen- & Ingenieurbau
Germany – Structural shell work – Schulprojekt Kardinal-von-Galen-Schule - Rohbauarbeiten
Opportunity Score
Warum diese Bewertung?
Chance
52 / 100
Komplexität
78 / 100
Risikofaktoren
The bid deadline is only about one week after publication, which creates a high risk of insufficient preparation time.
DB prequalification or PQ-VOB may be required, and supporting evidence can be requested within 6 calendar days.