County road 49 Fossenbratte tunnel - upgrading of tunnels
Originaltitel der Bekanntmachung
Norway – Construction work – County road 49 Fossenbratte tunnel - upgrading of tunnels
Opportunity Score
Warum diese Bewertung?
Chance
40 / 100
Komplexität
65 / 100
Risikofaktoren
No estimated contract value provided; bidder cannot gauge scale or financial risk.
Award criteria not stated; bidder may need to infer evaluation method from tender documents.
Submission deadline in 7 days
Tiefe Portfolioanalyse
Verwendet:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Überblick
Moderate opportunityWichtige Fakten
- Works contract
- 1 lot
- Duration until Jan 2028
- Replacing and modernising electrical and technical control installations
- Establishment of a new technical building (open air)
Vollständige Zusammenfassung anzeigen
The tender concerns the upgrading of Fossenbratte tunnel on county road 49 in Samnanger municipality, Norway. The work includes replacing electrical and technical installations, building a new technical building, drainage, and railings. The tunnel is 665m long, class B, with 80 km/h speed limit. The procedure is open, with a single lot. Estimated value is not provided. The deadline for submission is 2026-09-08. The procurement is EU-funded.
Risiken
No estimated contract value provided; bidder cannot gauge scale or financial risk.
Award criteria not stated; bidder may need to infer evaluation method from tender documents.
Submission deadline in 7 days
Analyse kann unvollständig sein
Nur ein Teil der Vergabeunterlagen wurde analysiert. Weitere Anforderungen, Zertifikate oder Einreichungsdokumente können in den übrigen Unterlagen enthalten sein.
Wichtige Anforderungen
Technical
- Tunnel upgrade in accordance with County Road Tunnel Safety Regulations
- Tunnel class B, length 665 m, ÅDT 2831 vehicles (15% heavy transport)
- Speed limit 80 km/h, 6% gradient towards Bjørkheim
Anforderungen können unvollständig sein.
Zuschlagskriterien
Lot 1
Auftraggeber
Ort
LEIKANGER, NOR
Kennung
821311632
Tätigkeit
General public services
Lose (1)
LOT-0000
County road 49 Fossenbratte tunnel - upgrading of tunnels
Upgrading of Fossenbratte tunnel including electrical and technical control installations, new technical building, drainage and surface water system, and railings. Works to achieve lane width 3.10m, sign height 4.2m, shoulder 0.5m.
Ort
Dauer
Kategorie
Zuschlagskriterien
Frist
Zuschlagsdetails
The Fossenbratte tunnel shall be upgraded in accordance with the County Road Tunnel Safety Regulations. The tunnel is located on county road 49 in Samnanger municipality, between Eikedalen and Bjørkheim. The tunnel has a length of 665 metres and one annual daily traffic (ÅDT) of 2831 vehicles (2023), of which 15% are heavy transport. It is classified in tunnel class B, signposted height 4.2 metres. The speed limit in the tunnel is 80 km/h. It has approx. 6% falls in the direction of Bjørkheim. The tunnel was opened to traffic in 1976. The upgrading mainly includes replacing and modernising electrical and technical control installations, the establishment of a new technical building in the open air, a new drainage and surface water system, as well as new railings both in the tunnel and in the open air zone. The completed upgraded tunnel shall have a lane width of 3.10 metres and the sign height of 4.2 metres, as well as the shoulder against the guide edge shall be 0.5 metres. The tender documentation is prepared as a model based basis with supplementary drawings. See also the tender documentation
Zusätzliche CPV-Codes
Hinweis zum Wert
Originale TED-Daten anzeigen
Originale TED-Beschreibung
The Fossenbratte tunnel shall be upgraded in accordance with the County Road Tunnel Safety Regulations. The tunnel is located on county road 49 in Samnanger municipality, between Eikedalen and Bjørkheim. The tunnel has a length of 665 metres and one annual daily traffic (ÅDT) of 2831 vehicles (2023), of which 15% are heavy transport. It is classified in tunnel class B, signposted height 4.2 metres. The speed limit in the tunnel is 80 km/h. It has approx. 6% falls in the direction of Bjørkheim. The tunnel was opened to traffic in 1976. The upgrading mainly includes replacing and modernising electrical and technical control installations, the establishment of a new technical building in the open air, a new drainage and surface water system, as well as new railings both in the tunnel and in the open air zone. The completed upgraded tunnel shall have a lane width of 3.10 metres and the sign height of 4.2 metres, as well as the shoulder against the guide edge shall be 0.5 metres. The tender documentation is prepared as a model based basis with supplementary drawings. See also the tender documentation
Vergabedetails
- Veröffentlichungsdatum
- 05 Jul 2026
- Sprachen
- English, Norwegian
Referenzmetadaten
- Rechtsgrundlage
- 32014L0024
Referenz-IDs
- Ausschreibungs-ID
- 462280-2026
Dokumente (2)
Ähnliche Ausschreibungen
Germany – Electrical installation work – Elektrotechnische Leistungen in 220-/380-kV-Umspannwerken / Electrotechnical Works in 220-/380-kV Substations
Sweden – Safety equipment – Upphandling av säkerhetsteknik
Germany – Construction work – Dynamisches Beschaffungssystem: Bauvergaben für das Gesamtprojekt "Maßnahmenpaket Betriebsgebäude I" und "Neubau der Straßenmeisterei Mittenwalde"
Ireland – Electrical installation work – Dynamic Purchasing System for Minor Building Works — Tradespersons
Sweden – Sewage treatment works – DIS: Modernisering av VA SYD:s produktionsanläggningar
Norway – Electrical engineering installation works – Dynamic purchasing system - Solar panels - Equipment and assembly
Opportunity Score
Warum diese Bewertung?
Chance
40 / 100
Komplexität
65 / 100
Risikofaktoren
No estimated contract value provided; bidder cannot gauge scale or financial risk.
Award criteria not stated; bidder may need to infer evaluation method from tender documents.
Submission deadline in 7 days
Tiefe Portfolioanalyse
Verwendet:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications