HVM36 - Penstocks
Originaltitel der Bekanntmachung
Iceland – Construction work for hydro-mechanical structures – HVM36 - Penstocks
Opportunity Score
Warum diese Bewertung?
Chance
30 / 100
Komplexität
65 / 100
Risikofaktoren
Penstocks design and installation require specialized hydro-mechanical expertise. Quality and performance risks if not...
Absence of estimated value and award criteria increases uncertainty in tender evaluation and financial planning.
Tiefe Portfolioanalyse
Verwendet:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Überblick
Moderate opportunityWichtige Fakten
- Works contract
- 1 lot
- Duration until Oct 2030
- Design, manufacture, shop testing, transport, installation, erection, field testing and commissioning of two steel penstocks with flow measurement systems
- Provision of all equipment, materials, engineering, temporary works, labour, supervision and services for a complete operational installation
Vollständige Zusammenfassung anzeigen
Tender by Landsvirkjun for design, manufacture, installation, and commissioning of two steel penstocks with flow measurement systems for a hydro project in Iceland. Single lot, negotiated procedure with call for competition. Deadline for submissions: 2026-07-21. No estimated value or award criteria provided in available data.
Risiken
Penstocks design and installation require specialized hydro-mechanical expertise. Quality and performance risks if not...
Absence of estimated value and award criteria increases uncertainty in tender evaluation and financial planning.
Analyse kann unvollständig sein
Nur ein Teil der Vergabeunterlagen wurde analysiert. Weitere Anforderungen, Zertifikate oder Einreichungsdokumente können in den übrigen Unterlagen enthalten sein.
Wichtige Anforderungen
Technical
- Negotiated procedure with call for competition (neg-w-call)
Administrative
- Electronic submission required via In-Tend platform
- Language: English
Anforderungen können unvollständig sein.
Auftraggeber
Name
Ort
Reykjavík, ISL
Auftraggeberprofil
Kennung
4202691299
Tätigkeit
General public services
Lose (1)
LOT-0001
HVM36 - Penstocks
Design, manufacture, shop testing, delivery, installation, field testing and commissioning of two steel penstocks with flow measurement systems, including all related mechanical, electrical and instrumentation work. Completion from January 2027 to October 2030, with installation June 2028 to April 2030.
Ort
Dauer
Kategorie
Frist
Zuschlagsdetails
The tender concerns the design, manufacture, shop testing, delivery, installation, field testing and commissioning of two steel penstocks with flow measurement systems. The work shall comprise the complete design, manufacture, shop testing, transport, installation, erection, field testing and commissioning of the penstocks and associated equipment, together with all equipment, materials, engineering, temporary works, labour, supervision and services required to provide a complete, satisfactory and fully operational installation. The scope shall include, but not be limited to, the penstocks with flow measurement systems and all related mechanical, electrical and instrumentation work necessary for the proper and reliable operation of the penstocks. Time for completion is estimated to be from January 2027 to October 2030, with installation of the penstocks over the period of June 2028 to April 2030.
Originale TED-Daten anzeigen
Originale TED-Beschreibung
The tender concerns the design, manufacture, shop testing, delivery, installation, field testing and commissioning of two steel penstocks with flow measurement systems. The work shall comprise the complete design, manufacture, shop testing, transport, installation, erection, field testing and commissioning of the penstocks and associated equipment, together with all equipment, materials, engineering, temporary works, labour, supervision and services required to provide a complete, satisfactory and fully operational installation. The scope shall include, but not be limited to, the penstocks with flow measurement systems and all related mechanical, electrical and instrumentation work necessary for the proper and reliable operation of the penstocks. Time for completion is estimated to be from January 2027 to October 2030, with installation of the penstocks over the period of June 2028 to April 2030.
Vergabedetails
- Veröffentlichungsdatum
- 01 Jul 2026
- Sprachen
- English
Referenzmetadaten
- Rechtsgrundlage
- 32014L0025
Referenz-IDs
- Ausschreibungs-ID
- 455109-2026
Dokumente (1)
Opportunity Score
Warum diese Bewertung?
Chance
30 / 100
Komplexität
65 / 100
Risikofaktoren
Penstocks design and installation require specialized hydro-mechanical expertise. Quality and performance risks if not...
Absence of estimated value and award criteria increases uncertainty in tender evaluation and financial planning.
Tiefe Portfolioanalyse
Verwendet:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications