Switzerland – Cable-supported transport systems with cabins – Halte de Russin - Création d'une liaison d'accessibilité par transport hectométrique

40/100

Opportunity Score

Needs reviewMedium complexity
WorksOpen
Warum diese Bewertung?

Chance

40 / 100

Komplexität

65 / 100

Risikofaktoren

Estimated value and detailed award criteria are missing. No procurement documents were analyzed. This makes it impossib...

Landscape integration approval from CFNP is a condition. Failure could delay or cancel project. This introduces uncerta...

Submission deadline in 5 days

Tiefe Portfolioanalyse

Tiefe Analyse der Unternehmenspassung

Verwendet:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Überblick

Moderate opportunity

Wichtige Fakten

  • Works contract
  • 1 lot
  • Complete design of the hectometric transport system (inclined elevator or funicular)
  • Obtaining all necessary building permits and concession requests
Vollständige Zusammenfassung anzeigen

This open tender by the Cantonal Office of Transport in Geneva, Switzerland, concerns the design, construction, supply, commissioning, and 10-year maintenance of a hectometric transport link (inclined elevator or funicular) connecting Russin railway station to the village. Key requirements include obtaining building permits, landscape integration approval from the Swiss Federal Commission for Nature and Landscape Protection, and periodic maintenance for 10 years. The procedure is open, but electronic submission is not allowed. The estimated value is not disclosed. No procurement documents were analyzed beyond the notice.

Risiken

Estimated value and detailed award criteria are missing. No procurement documents were analyzed. This makes it impossib...

Landscape integration approval from CFNP is a condition. Failure could delay or cancel project. This introduces uncerta...

Submission deadline in 5 days

No procurement documents available

Analyse kann unvollständig sein

Nur ein Teil der Vergabeunterlagen wurde analysiert. Weitere Anforderungen, Zertifikate oder Einreichungsdokumente können in den übrigen Unterlagen enthalten sein.

Wichtige Anforderungen

Technical

  • Landscape integration must meet the requirements of the Swiss Federal Commission for Nature and Landscape Protection (CFNP) – a condition for project realization
  • Must engage a landscape architect from the project phase
  • 10-year maintenance period after commissioning

Anforderungen können unvollständig sein.

Zuschlagskriterien

Lot 1

Quality-based award criteria (weight not specified).

Auftraggeber

Lose (1)

LOT-0000

Accessibility link design and build

Design, realization, supply, commissioning, and 10-year maintenance of a hectometric transport system (inclined elevator or funicular) between Russin railway halt and village. Includes obtaining permits, civil works, mechanical/electromechanical equipment, and landscape integration.

WorksEU fundedElectronic submission

Ort

Russin, Switzerland

Kategorie

Cable-supported transport systems

Zuschlagskriterien

Quality

Frist

Deadline Aug 31, 2026

Vergabedetails

Veröffentlichungsdatum
30 Jun 2026
Sprachen
French

Referenzmetadaten

Rechtsgrundlage
32014L0024

Referenz-IDs

Ausschreibungs-ID