Øygarden 132kV Turnkey Contract
Originaltitel der Bekanntmachung
Norway – Construction work for pipelines, communication and power lines – Øygarden 132kV Totalentreprise
Opportunity Score
Warum diese Bewertung?
Chance
60 / 100
Komplexität
70 / 100
Risikofaktoren
Crucial tender documents (e.g., detailed technical specifications, special contract conditions) are missing or not anal...
Negotiated procedure may require multiple rounds and pre-qualification, which could be time-consuming and resource-inte...
No procurement documents available
Tiefe Portfolioanalyse
Verwendet:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Überblick
Moderate opportunityWichtige Fakten
- NOK 70M estimated value
- Works contract
- 1 lot
- Duration until Dec 2029
- Design and construction of a complete class 3 substation
- Buildings and technical installations
Vollständige Zusammenfassung anzeigen
Design-build (turnkey) contract for the establishment of Øygarden 132kV substation, including design and construction of a complete class 3 substation, cable systems, line connection, and demolition of existing grid. Single lot. Negotiated procedure. Estimated value 70,000,000 NOK. Deadline 2026-08-21.
Risiken
Crucial tender documents (e.g., detailed technical specifications, special contract conditions) are missing or not anal...
Negotiated procedure may require multiple rounds and pre-qualification, which could be time-consuming and resource-inte...
No procurement documents available
Analyse kann unvollständig sein
Nur ein Teil der Vergabeunterlagen wurde analysiert. Weitere Anforderungen, Zertifikate oder Einreichungsdokumente können in den übrigen Unterlagen enthalten sein.
Wichtige Anforderungen
Technical
- Turnkey design-build contract
- Class 3 substation
- Compliance with applicable laws, regulations, and standards
Anforderungen können unvollständig sein.
Zuschlagskriterien
Lot 1
Auftraggeber
Name
Ort
Bergen, NOR
Kennung
976944801
Tätigkeit
Electricity-related activities
Lose (1)
LOT-0001
Øygarden 132kV Turnkey Contract
The contracting authority intends to award a design-build (turnkey) contract for the establishment of the Øygarden substasjon. The project includes both design and construction of a complete class 3 substation, including buildings, technical installations, and associated infrastructure. The contract also covers the installation of cable systems and routing, including a new line connection between Blomøy and the new substasjon, as well as demolition of selected parts of the existing grid. The design-build contractor will be responsible for the entire delivery, from detailed design and procurement to execution and completion, in accordance with applicable laws, regulations, and standards. All relevant disciplines are included (civil works, HVAC, electrical, telecommunications, and automation), including coordination and integration between them. The 145 kV GIS switchgear is not included in this procurement. However the contractor shall ensure all necessary provisions for installation, interfaces, and integration with this system. The station will include functions such as a control room, technical rooms (fiber, battery, and distribution), backup power, GIS room, cable basement, and locker room facilities.
EUR 6.2M
Geschätzter Wert
Ort
Dauer
Kategorie
Zuschlagskriterien
Frist
Zuschlagsdetails
See Tenderdocuments
Zusätzliche CPV-Codes
Hinweis zum Wert
Originale TED-Daten anzeigen
Originaler Los-Titel
Øygarden 132kV Totalenreprise
Originale TED-Beschreibung
The contracting authority intends to award a design-build (turnkey) contract for the establishment of the Øygarden substasjon. The project includes both design and construction of a complete class 3 substation, including buildings, technical installations, and associated infrastructure. The contract also covers the installation of cable systems and routing, including a new line connection between Blomøy and the new substasjon, as well as demolition of selected parts of the existing grid. The design-build contractor will be responsible for the entire delivery, from detailed design and procurement to execution and completion, in accordance with applicable laws, regulations, and standards. All relevant disciplines are included (civil works, HVAC, electrical, telecommunications, and automation), including coordination and integration between them. The 145 kV GIS switchgear is not included in this procrument. However the contractor shall ensure all necessary provisions for installation, interfaces, and integration with this system. The station will include functions such as a control room, technical rooms (fiber, battery, and distribution), backup power, GIS room, cable basement, and locker room facilities.
Vergabedetails
- Veröffentlichungsdatum
- 29 Jun 2026
- Sprachen
- English, Norwegian
Referenzmetadaten
- Rechtsgrundlage
- other
Referenz-IDs
- Ausschreibungs-ID
- 448421-2026
Dokumente (1)
Ähnliche Ausschreibungen
Poland – Construction work – Budowa systemu ładowania autobusów elektrycznych na terenie Oddziału Przewozów R-1 „Woronicza”
France – Concrete carcassing work – Travaux d’extension du restaurant scolaire de WITRY-LES-REIMS-.
Switzerland – Concrete carcassing work – CERM - Centre d'entretien routier des montagnes - La Chaux-de-Fonds - LOT GC03_Béton armé et maçonnerie - CFC 13,211.0,211.5,211.6, 212
France – Concrete carcassing work – Construction d'un complexe sportif urbain rue de Courcelles - Lots 2 à 5 et 12 à 20-.
Poland – Construction, foundation and surface works for highways, roads – Projekt i budowa drogi ekspresowej S19 odcinek granica woj. podlaskiego – Łosice – granica woj. lubelskiego, odc. realizacyjny nr 1 granica woj. podlaskiego - węzeł Łosice (bez węzła)
Poland – Construction, foundation and surface works for highways, roads – Projekt i budowa drogi ekspresowej S19 na odcinku granica woj. podlaskiego – Łosice – granica woj. lubelskiego, odc. realizacyjny nr 2: węzeł „Łosice” (z węzłem) – granica woj. lubelskiego
Opportunity Score
Warum diese Bewertung?
Chance
60 / 100
Komplexität
70 / 100
Risikofaktoren
Crucial tender documents (e.g., detailed technical specifications, special contract conditions) are missing or not anal...
Negotiated procedure may require multiple rounds and pre-qualification, which could be time-consuming and resource-inte...
No procurement documents available
Tiefe Portfolioanalyse
Verwendet:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications