Tenderwize
Zurück zur Suche

Three-stage design documentation for Tyniecka Street reconstruction and related infrastructure

Zarząd Dróg Miasta Krakowa·Kraków, Poland·Deadline Jul 31, 2026 · 19 days left·Open·Services
Original notice title

Poland – Engineering design services – Opracowanie trzy etapowej kompleksowej dokumentacji projektowej dla rozbudowy/przebudowy ulicy Tynieckiej na odcinku od ul. Winnickiej do Kompleksu Przystanków „Park Skały” wraz z infrastrukturą towarzyszącą w celu budowy chodnika, budowy sieci wodociągowej oraz budowy sieci kanalizacji sanitarnej w ramach zadania: „Program budowy chodników”.

58/100

Opportunity Score

Needs reviewHigh complexity
ServicesOpen
Why this score?

Opportunity

58 / 100

Complexity

72 / 100

Risk factors

The submission deadline is fixed and the offer validity extends to 28.10.2026; late submission would invalidate the bid.

The experience requirement is specific: at least one design documentation service with an administrative decision for a...

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Moderate opportunity

Key Facts

  • Services contract
  • 1 lot
  • Duration 38 MONTH
  • Preparation of three-stage comprehensive design documentation for road reconstruction/extension and accompanying infrastructure.
  • Obtaining and delivering the environmental decision with annexes.
Show full summary

Open EU-funded services tender for three-stage engineering design documentation for the reconstruction/extension of Tyniecka Street in Kraków, including a sidewalk, water supply network and sanitary sewer. One lot is provided. Electronic submission is required via platformazakupowa.pl. The notice includes explicit exclusion grounds, a minimum 36-month warranty requirement, and a 38-month contract duration. No contract value is stated in the provided data.

Risks

The submission deadline is fixed and the offer validity extends to 28.10.2026; late submission would invalidate the bid.

The experience requirement is specific: at least one design documentation service with an administrative decision for a...

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Technical

  • Minimum warranty period is 36 months; offers below this are rejected.
  • Maximum warranty period is 60 months.

Administrative

  • Electronic submission is required.

Award Criteria

Lot 1

Price - gross price, weight 60, code per-exa60%Quality - warranty period length, weight 40, code per-exa40%

Buyer

Name

Zarząd Dróg Miasta Krakowa

Location

Kraków, POL

Buyer profile

Open profile

Identifier

676 101 37 17

Activity

General public services

Lots (1)

LOT-0001

Three-stage design documentation for Tyniecka Street reconstruction and related infrastructure

Preparation of three-stage comprehensive design documentation for the reconstruction/extension of Tyniecka Street from Winnicka Street to the 'Park Skały' stop complex, including accompanying infrastructure for a sidewalk, water supply network and sanitary sewer. The lot also covers obtaining environmental and road investment decisions and final project documentation. Source: structured data and XML notice.

ServicesEU fundedElectronic submission

Location

PL213, Poland

Duration

38 MONTH

Category

Engineering design services

Selection criteria

Price

Deadline

Deadline Jul 31, 2026

Procurement Details

Publication date
29 cze 2026
Notice type
Contract notice — standard
Languages
Polish

Reference metadata

Notice subtype
16
Notice version
1
Legal basis
32014L0024

Reference IDs

Tender ID
446281-2026

Documents (1)

Similar tenders