Design and construction of ERTMS/ETCS level 2 system on railway lines 133 and 91 Kraków Główny – Podłęże

PKP Polskie Linie Kolejowe S.A.·Warszawa, Poland·Deadline Aug 05, 2026 · 5 days left·Open·Works
Originaltitel der Bekanntmachung

Poland – Construction work – Zaprojektowanie i wykonanie robót dla zadania pn.: „Zabudowa systemu ERTMS/ETCS poziomu 2 na liniach kolejowych nr 133 i 91 odc. Kraków Główny – Podłęże” w ramach projektu „Zabudowa systemu ERTMS”.

50/100

Opportunity Score

Needs reviewHigh complexity
WorksOpen
Warum diese Bewertung?

Chance

50 / 100

Komplexität

85 / 100

Risikofaktoren

Very specific experience requirements: must have built at least one ERTMS/ETCS Level 2 system with RBC and GSM-R integr...

No estimated contract value disclosed; bidders cannot assess financial exposure or budget capacity.

Submission deadline in 5 days

Tiefe Portfolioanalyse

Tiefe Analyse der Unternehmenspassung

Verwendet:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Überblick

Moderate opportunity

Wichtige Fakten

  • Works contract
  • 1 lot
  • Duration 29 MONTH
  • Design and construction of ERTMS/ETCS Level 2 system on railway lines 133 and 91 (Kraków Główny – Podłęże)
  • Preparation of preliminary and detailed design documentation, including operational scenarios and test cases
Vollständige Zusammenfassung anzeigen

This tender by PKP Polskie Linie Kolejowe S.A. concerns the design and construction of an ERTMS/ETCS Level 2 signaling system on railway lines 133 and 91 from Kraków Główny to Podłęże, Poland. The contract is in the 'design and build' system with a 29-month duration and includes two optional scopes (extension to Kraków Bieżanów–Podłęże and RBC handover modifications). The procedure is open, EU-funded, with electronic submission required. No estimated value is disclosed. Award is based solely on price (100%). Strict eligibility criteria require proven experience in ERTMS/ETCS Level 2, SRK systems, and financial capacity (min. annual turnover 10.6M PLN, credit line 2.6M PLN). Only the TED XML notice was analyzed; full procurement documents (PFU, SWZ) were not available.

Risiken

Very specific experience requirements: must have built at least one ERTMS/ETCS Level 2 system with RBC and GSM-R integr...

No estimated contract value disclosed; bidders cannot assess financial exposure or budget capacity.

Submission deadline in 5 days

Analyse kann unvollständig sein

Nur ein Teil der Vergabeunterlagen wurde analysiert. Weitere Anforderungen, Zertifikate oder Einreichungsdokumente können in den übrigen Unterlagen enthalten sein.

Wichtige Anforderungen

Technical

  • Design-build contract for ERTMS/ETCS Level 2 system
  • EU-funded project under the European Funds for Infrastructure, Climate, Environment 2021-2027

Administrative

  • Electronic submission via procurement platform required

Zuschlagskriterien

Lot 1

Total gross price (including base and optional scopes) - weight 100%100%

Auftraggeber

Ort

Warszawa, POL

Auftraggeberprofil

Profil öffnen

Kennung

NIP 113-23-16-427, REGON 017319027

Tätigkeit

Railway services

Lose (1)

LOT-0001

Design and construction of ERTMS/ETCS level 2 system on railway lines 133 and 91 Kraków Główny – Podłęże

Design and construction of ERTMS/ETCS Level 2 system on railway lines 133 and 91, including preliminary documentation, design, construction, conformity assessment, and obtaining operational approval. Also includes optional scopes: Option 1 (extension to Podłęże) and Option 2 (RBC handover modifications). Duration 29 months (20 months for works, 29 for approvals). Place of performance: Małopolskie, Poland.

WorksEU fundedElectronic submission

Ort

PL214, Poland

Dauer

29 MONTH

Kategorie

Construction work

Zuschlagskriterien

Price

Frist

Deadline Aug 05, 2026

Vergabedetails

Veröffentlichungsdatum
28 Jun 2026
Sprachen
Polish

Referenzmetadaten

Rechtsgrundlage
32014L0025

Referenz-IDs

Ausschreibungs-ID
445716-2026