Tenderwize
Zurück zur Suche

Supply of 40 Low-Floor Air-Conditioned Articulated Trams

СТОЛИЧЕН ЕЛЕКТРОТРАНСПОРТ ЕАД·гр. София, Bulgaria·EUR 102.3M·Expired · Aug 10, 2026·Open·Supplies
High valueStructured notice only
Originaltitel der Bekanntmachung

Bulgaria – Railway and tramway locomotives and rolling stock and associated parts – ДОСТАВКА НА 40 БРОЯ НОВИ НИСКОПОДОВИ КЛИМАТИЗИРАНИ СЪЧЛЕНЕНИ ТРАМВАЙНИ МОТРИСИ ЗА МЕЖДУРЕЛСИЕ 1009 mm

60/100

Opportunity Score

Needs reviewHigh complexity
SuppliesExpired
Warum diese Bewertung?

Chance

60 / 100

Komplexität

75 / 100

Risikofaktoren

Turnover requirement equal to full estimated value may be overly restrictive and could be challenged.

Extensive technical criteria with subjective scores (e.g., rotating bogies definition, corrosion protection method eval...

Tiefe Portfolioanalyse

Tiefe Analyse der Unternehmenspassung

Verwendet:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Eckdaten der Ausschreibung

Öffentlicher Auftraggeber
СТОЛИЧЕН ЕЛЕКТРОТРАНСПОРТ ЕАД
Land
Bulgarien
CPV
34600000 - Railway and tramway locomotives and rolling stock and associated parts +1 weitere
Frist
Aug 10, 2026
Geschätzter Wert
EUR 102.3M

Überblick

Moderate opportunity

Wichtige Fakten

  • EUR 102.3M estimated value
  • Supplies contract
  • 1 lot
  • Duration 36 MONTH
  • Supply of 40 low-floor air-conditioned articulated trams for 1009 mm gauge
  • Training of buyer's staff for operation, maintenance, diagnostics, and repair
Vollständige Zusammenfassung anzeigen

The tender by Stolichen Elektrotransport EAD (Sofia) for the supply of 40 new low-floor air-conditioned articulated trams for 1009 mm gauge, including training, diagnostic equipment, special tools, and documentation. Single lot, open procedure, EU-funded (though XML indicates no EU funds? inconsistency noted), estimated value EUR 102,258,376.24. Performance in Sofia, Bulgaria. Deadline 2026-08-10. Award criteria: Price 40%, Technical quality 40%, Delivery time 10%, Warranty conditions 10%. Minimal turnover requirement equals estimated value in rail rolling stock supply.

Risiken

Turnover requirement equal to full estimated value may be overly restrictive and could be challenged.

Extensive technical criteria with subjective scores (e.g., rotating bogies definition, corrosion protection method eval...

Analyse kann unvollständig sein

Nur ein Teil der Vergabeunterlagen wurde analysiert. Weitere Anforderungen, Zertifikate oder Einreichungsdokumente können in den übrigen Unterlagen enthalten sein.

Wichtige Anforderungen

Technical

  • Trams must be low-floor, air-conditioned, articulated, for 1009 mm gauge
  • Delivery in 36 months maximum, 12 months minimum
  • Offer must include price, technical specification, delivery time, and warranty conditions

Anforderungen können unvollständig sein.

Zuschlagskriterien

Lot 1

Price – weight 40 points — 40%Technical quality – weight 40 points — 40%Delivery time – weight 10 points — 10%Warranty conditions – weight 10 points — 10%

Auftraggeber

Ort

гр. София, BGR

Auftraggeberprofil

Profil öffnen

Kennung

121683785

Tätigkeit

Urban railway, tramway, trolleybus or bus services

Lose (1)

LOT-0001

Supply of 40 Low-Floor Air-Conditioned Articulated Trams

Delivery of 40 new low-floor air-conditioned articulated trams for 1009 mm gauge, training of buyer's personnel for operation and maintenance, supply of diagnostic equipment (Appendix 3), special tools (Appendix 4), and documentation.

SuppliesEU fundedElectronic submission

EUR 102.3M

Geschätzter Wert

Ort

София, Bulgaria

Dauer

Oct 2026

Kategorie

Railway

Zuschlagskriterien

Best price-quality ratio

Frist

Expired Aug 10, 2026

Vergabedetails

Veröffentlichungsdatum
24 Jun 2026
Sprachen
Bulgarian

Referenzmetadaten

Rechtsgrundlage
32014L0025

Referenz-IDs

Ausschreibungs-ID
435717-2026

Dokumente (1)

Ähnliche Ausschreibungen